Change Event Extraction

Purpose

Read every document in this project library and compile a complete, structured record of every event that affected — or should have affected — the project's scope, timeline, budget, or technical approach. This is the factual foundation for all subsequent analysis. Be thorough: a signal buried in a footnote is as important as a formal change request.


Step 1 — Read all documents

Process ALL documents in the Project Documents library. Note each document's title, author (if stated), and date. Do not skip or skim any document. Read attachments, appendices, and meeting notes as carefully as the main body.


Step 2 — Identify change events

For each document, identify every instance of the following event types:

Event type What qualifies
Scope assumption established A baseline, estimate, or assumption that the project plan, budget, or timeline depends on — especially if unvalidated
Scope change Addition, reduction, or modification to agreed deliverables, data, or work
Technical decision Architecture or technology choice made or changed during delivery
Client request Any instruction or request from the client affecting scope, approach, schedule, or budget — formal or informal
Risk event Risk identified, rating changed, risk materialising, risk dismissed, or risk downgraded below its true severity
Budget event Cost variance, overrun, approved financial change, or budget assumption set
Schedule event Milestone slippage, date change, sprint replan, or timeline extension
Governance event Change request raised, steering committee decision, approval, escalation, or missed change control step
Signal / early warning Any observation, comment, or flagged item that indicated potential future risk — even if not formally escalated

Step 3 — Extract all fields for every event

For each event, extract every field in the table below. If a field is not documented, state "Not documented" — do not omit the field or leave it blank.

Field What to capture If not available
# Sequential event number
Date Exact date if stated Approximate (e.g. "~Week 5")
Week Engagement week number Derive from date if possible
Event type One of the categories above
Source document File name and section or heading
Title Short descriptive title, 5–8 words
Description One factual sentence — exactly what happened
Parameter changed Specific value that changed, with before/after (e.g. "Data volume: 2 TB → 6.24 TB") "N/A — no parameter change"
Reason / rationale Why did this happen? What drove the change or decision? Quote the source if available "Not documented"
Raised by Name and role of person who raised, flagged, or initiated the event "Not documented"
Approved / acknowledged by Name and role of person who formally approved or acknowledged, or "Not required" / "Not obtained" "Not documented"
Action taken What was done in response — CR raised, risk logged, observation noted, escalated, ignored "No action documented"
Missing information What should have been captured, validated, or escalated but was not — be specific "None identified"
Impact Downstream consequence this event had or could have had — be specific and quantify if possible
Change order raised? Yes / No / Pending / Not Applicable
Signal strength HIGH = project-threatening if unresolved; MEDIUM = concerning, warrants escalation; LOW = noted for awareness

Step 4 — Write to the Change Events list

For each event extracted in Step 3, create one item in the Change Events list on this SharePoint site. Use the exact column names defined in SHAREPOINT.md. Populate every column for every event. Do not skip any event.

If an item for this event already exists in the list (matched by Title and Date), update it rather than creating a duplicate.

After all items are written, confirm the count: "N events written to the Change Events list."


Output — produce the following in chat


SECTION 1: CHAT SUMMARY

Begin with the following framing statement, exactly as written:

"Names in this log record who held information or decision authority at each event point. This analysis identifies process and governance gaps — where controls were needed and not in place."

Then produce the following:

Change Events list: State the total count — "[N] change events have been written to the Change Events list on this site." Do not reproduce the full change log table in chat.

Headline metrics:

  • HIGH signal events: list each by title
  • Events with no change order raised: count and % of total
  • Governance gap score: N / 10
  • Scope Churn Index: N%

Missing Information Summary: a bulleted list of the most significant documentation gaps across all events — things that should exist in a well-run engagement but were absent. Be direct and specific. Examples: "No formal validation of the Week 2 data volume estimate is documented anywhere in the project record." or "Risk R-009 was rated Medium/Low but no quantitative basis for that rating is recorded."


SECTION 2: THREE SUMMARY LEVELS

Produce all three of the following, clearly labelled:


ULTRA-SHORT SUMMARY

For: executive slide decks, steering committee updates, RAID log entries

Write 4–6 bullet points. Each bullet is one sentence. Cover only the most consequential events — decisions made, things that went wrong, and outcomes. A reader should be able to read this in 20 seconds and understand the project's critical path of failure. No background, no process detail.


GET ME UP TO SPEED

For: a new project manager stepping in, a delivery director being briefed, a client asking "what happened"

Write 3–5 paragraphs as a coherent narrative. Chronological. Imagine you are briefing someone intelligent who knows nothing about this project and has 3 minutes. Cover: what the project was, the key decisions and assumptions made, what signals appeared and how they were handled, when the failure became visible, and what the current situation is. Include specific dates, numbers, names, and document references. Write in plain English — no jargon, no passive voice.


DETAILED FULL HISTORY

For: post-mortem reviews, governance audits, contract disputes, lessons learned

A structured narrative with one paragraph per major phase or cluster of events. This is the complete record — every event matters. Include all rationale recorded, who knew what and when, what was actioned and what was not, and where the documentation record falls short. Do not summarise away detail. This section should be suitable for use in a formal project review or as background for a legal review.


SECTION 3: PROJECT INTELLIGENCE DASHBOARD

Produce this section under the heading ## PROJECT INTELLIGENCE DASHBOARD.

Change Event KPIs

KPI Value Commentary
Total change events extracted
Events with no change order raised Include % of total
Events with undocumented or missing rationale Include % of total
Events with no named approver Include % of total
HIGH signal strength events
HIGH signal events that were formally actioned State as "N of N"
Weeks between first HIGH signal and impact event Quantifies how long the window was open
Change concentration period The engagement week range with highest event density
Governance gap score Rate 0–10: 0 = all changes properly governed; 10 = none

Change Type Breakdown

State the count of events by type. Example format: 3 scope events · 4 risk events · 2 governance events · 1 budget event · 2 schedule events

Scope Churn Index

For every project parameter that changed between baseline and actual (data volume, table count, budget, timeline, team size, etc.):

Parameter Baseline value Source of baseline Actual value Source of actual Variance Variance %

Sum the absolute variance percentages and divide by the number of parameters — this is the overall Scope Churn Index. A score above 50% indicates a project that was significantly mispriced or misscoped at inception.

Top 3 Governance Gaps

The three most consequential instances where a change, risk, or assumption should have triggered formal governance but did not. Each gap on one line: what it was, when it was present, and what the correct governance action should have been.

  1. [Gap description — date — correct action]
  2. [Gap description — date — correct action]
  3. [Gap description — date — correct action]

Documentation Quality Rating

Rate the overall quality of the project's change management documentation on a scale of 1–5:

  • 5 — Complete: every change has rationale, approver, and action documented
  • 4 — Good: most changes documented; minor gaps
  • 3 — Partial: key decisions documented but rationale and approvals often missing
  • 2 — Poor: events can be inferred but documentation is sparse and inconsistent
  • 1 — Inadequate: significant events reconstructed from context; major gaps in record

State the rating and one sentence explaining the primary reason for the score.