Execution Planning

Core principle: A decision without a plan is a wish. Decompose work into tasks with dependencies, owners, timelines, and risk buffers. The plan's job is not to predict the future perfectly — it's to make the critical path visible and the risks explicit.


When to Use This Skill

  • A decision has been made (decision-synthesis, architecture-evaluation, or direct commitment) and needs to be implemented
  • Work involves multiple people, teams, or phases requiring coordination
  • Someone asks "how long will this take?" and the honest answer requires decomposition
  • A project is underway but has no visible critical path or dependency map
  • An architecture decision (Contract E) needs to be turned into a build plan

Core Methodology

Step 1: Frame the Execution Context

  • Decision being executed: State the committed decision. From decision-synthesis: reference the recommendation. From architecture-evaluation (Contract E): capture the ADR decision, constraints, lock-in risks, migration requirements, sequencing hints.
  • Constraints: Non-negotiable boundaries — budget, team size, compliance, hard deadlines, technology lock-ins.
  • Stakeholder alignment: Who has bought in, who hasn't. Residual objections (Contract B) become execution risks.
  • Definition of done: An observable outcome. Not activity ("we built it") but result ("users can do X, metric Y improved").

Step 2: Build the Work Breakdown Structure

Decompose recursively: deliverables → work packages → tasks.

  • Deliverables: 3-7 major outputs that, together, constitute "done"
  • Work packages: Groupings of related tasks producing a deliverable (assignable to one owner)
  • Tasks: Smallest unit producing a verifiable output (typically 1-5 days)

Rules:

  • Every task has a verifiable output — inspectable, demoable, or testable
  • No task larger than one person-week. If it is, decompose further.
  • Include forgotten tasks: documentation, testing, migration, rollback planning, stakeholder communication
  • Include integration tasks explicitly — "build A" and "build B" need an "integrate A with B" task

Step 3: Map Dependencies

For every task:

  • What must finish before this can start? (predecessor)
  • What can't start until this finishes? (successor)
  • What can run in parallel? (no dependency)

Represent as a DAG. Look for:

  • Sequential chains that force serialization — can any be parallelized with a different design?
  • Convergence points where streams merge — high-risk coordination moments
  • External dependencies — approvals, vendor deliveries, other teams' work — flag as risks

Step 4: Identify the Critical Path

The longest chain of dependent tasks from start to finish — it determines the minimum possible timeline.

  • Highlight the critical path explicitly — every task on it is a schedule risk
  • Tasks not on it have float (slack time). Quantify it.
  • If the critical path is too long: parallelize, reduce scope, add resources to critical-path tasks, or accept the timeline

Step 5: Estimate Durations

Use reference-class estimation: estimate based on how long similar work has actually taken before, not how long you hope.

For each task, three estimates:

  • Optimistic (O): everything goes right (10th percentile)
  • Most likely (M): realistic with normal friction (50th percentile)
  • Pessimistic (P): significant obstacles (90th percentile)

Expected duration (PERT): (O + 4M + P) / 6. Use pessimistic for critical-path tasks and external dependencies.

Common estimation failures:

  • Planning fallacy: people underestimate by 50-100% on average. Calibrate against past actuals.
  • Anchoring on optimism: most-likely is not optimistic
  • Ignoring integration time: individual tasks estimated well, but the time to make them work together is missed

Step 6: Assign Ownership

  • Owner: One person accountable for delivery (not a committee)
  • Contributors: Who else is needed
  • Decision authority: Can the owner make scope/approach decisions, or escalate?

RACI where coordination is complex:

  • Responsible: Does the work
  • Accountable: Owns the outcome (one person only)
  • Consulted: Provides input before
  • Informed: Notified after

Step 7: Design Milestones and Risk Buffers

Place milestones at points where progress is objectively observable — not "50% complete" but "API endpoints deployed and passing integration tests."

Risk buffers:

  • Task-level: Add to high-uncertainty tasks (use the gap between most-likely and pessimistic)
  • Project buffer: 15-25% of critical path duration at the end. Absorbs accumulated variance individual estimates miss.
  • Feeding buffers: Where a non-critical-path stream feeds into the critical path, add a buffer at the merge point

Step 8: Surface Execution Risks and Resource Asks

Top risks paired with mitigations:

  • Dependency risks: External teams, vendor delays, approval bottlenecks
  • Capability risks: Skills the team doesn't have, unfamiliar technology
  • Scope risks: Requirements likely to change or expand
  • Integration risks: Components that must work together but built separately

For risks requiring resources, time, or scope changes beyond what's been approved, produce a resource ask in Contract C format for argument-craft:

  • What's needed: Specific resource, time extension, scope change
  • Why: The execution risk or critical-path constraint driving the ask
  • Consequence of not getting it: What fails, degrades, or gets delayed

Output Format

🎯 Execution Objective

  • Decision being executed: [decision — reference source analysis if applicable]
  • Definition of done: [observable outcome that proves completion]
  • Hard constraints: [budget, team, deadline, compliance, technology lock-ins]
  • Stakeholder alignment status: [who's bought in, residual objections]

📋 Work Breakdown Structure

# Deliverable Work Package Task Output Owner Est. Duration
1.1.1 [Deliverable 1] [Package 1.1] [Task] [Verifiable output] [Person] [O/M/P → Expected]

⚖️ Dependency Map

[Task 1.1.1] → [Task 1.1.2] → [Task 2.1.1]  ← CRITICAL PATH
[Task 1.2.1] → [Task 1.2.2] ─────────────→ [Task 2.1.1]
                              (float: X days)
[Task 3.1.1] (parallel, no dependencies)

📊 Timeline and Milestones

Milestone Date Proof of Completion On Critical Path?
[Milestone] [date] [observable output] Yes / No
Project buffer [date range] — —

👥 Ownership Matrix

Work Package Responsible Accountable Consulted Informed
[Package] [who] [who] [who] [who]

⚠️ Top Execution Risks

Risk Likelihood Impact Mitigation Owner
[risk] H / M / L [what breaks] [action] [who]

🔄 Resource Asks (Contract C → argument-craft)

What's Needed Why Consequence of Not Getting It
[resource/time/scope change] [risk or constraint] [what fails or degrades]

Thinking Triggers

  • "What's on the critical path that I'm not seeing?"
  • "Where are the integration points, and who owns the handoff?"
  • "Am I estimating based on how long this took last time, or how long I wish it would take?"
  • "What external dependency could blow up this timeline?"
  • "If I had to cut scope to hit the deadline, which deliverables would I protect?"

Common Traps

Activity-based milestones: "Design phase complete" is not a milestone. "API schema reviewed and approved by consuming teams" is. Milestones must be observable from the outside.

Estimating without decomposing: "The project will take 3 months" is a guess. Break it down, estimate the pieces, and let the critical path tell you the timeline.

Ignoring the planning fallacy: Every team thinks they're the exception. Use reference-class data, not gut feel.

No project buffer: Individual estimates absorb individual variance. Project buffers absorb correlated risk — things that affect multiple tasks simultaneously (team member leaves, requirements change, integration is harder than expected).

Single-point estimates: "Takes 5 days" hides all uncertainty. Three-point estimates force you to confront what could go wrong.

Phantom parallelism: The plan shows tasks running in parallel, but the same three people are assigned to all of them. Resource-constrained scheduling is different from dependency-constrained scheduling.