Applicable scenarios
- First-version scope definition for new products/new features
- Prevent requirement bloat
- Priority convergence for an existing feature list
- Input for the project manager (what must be done, what can be deferred)
Core principles
MVP = the smallest closed loop that can validate the core value
It is not "doing a few fewer features," but rather "doing the fewest features while still being able to run through the complete business process."
错误理解:
完整产品 = 100 个功能
MVP = 10 个功能
→ 砍 90 个,但用户体验断裂
正确理解:
完整产品 = 100 个功能
MVP = 能完成 1 个核心业务闭环的最少功能
→ 假设 15 个功能能跑通,就做 15 个
The four-level MoSCoW classification
Must Have(必须有)
没有它功能不能成立
例:电商 MVP 的"下单"功能
Should Have(应该有)
影响体验,但可在第二版补
例:电商 MVP 的"优惠券"
Could Have(可以有)
锦上添花,资源充足时再做
例:电商 MVP 的"商品评分"
Won't Have(暂不做)
明确排除,防止范围蔓延
例:电商 MVP 的"直播带货"
Non-Goals
More important than the MVP scope is explicitly writing out "what will not be done":
为什么需要非目标:
- 防止需求方反复加塞
- 减少团队理解偏差
- 保留后续版本的设计空间
- 避免在不重要的事情上浪费精力
写法:
❌ "这一版不做太多功能"(模糊)
✅ "这一版不做:
- 多语言支持(仅中文)
- 移动端原生 APP(仅 H5)
- 第三方支付集成(仅微信支付)
- 商家自助入驻(仅运营手动配置)"
MVP slicing workflow
1. 列出所有候选功能
↓
2. 识别核心业务闭环
(用户从进入到完成核心目标的最短路径)
↓
3. 标注每个功能在闭环中的角色:
- 必经节点 → Must
- 可省略但有损 → Should
- 完全可选 → Could
↓
4. 明确写出 Won't(非目标)
↓
5. 用 1 句话描述 MVP:
"用户可以 [做什么],从而 [获得什么价值],但暂时不能 [哪些限制]"
↓
6. 检查闭环是否完整(不能有断点)
MVP description template
## MVP 范围:[功能/产品名]
### 核心业务闭环
[一句话描述用户能完成什么]
### Must Have(这一版必须有)
| # | 功能 | 在闭环中的角色 |
|---|------|---------------|
| 1 | 用户注册/登录 | 入口 |
| 2 | 浏览商品列表 | 发现 |
| 3 | 商品详情页 | 决策 |
| 4 | 加入购物车 | 收集 |
| 5 | 下单结算 | 转化 |
| 6 | 在线支付 | 完成 |
| 7 | 订单状态查询 | 反馈 |
### Should Have(第二版补)
- 商品搜索
- 优惠券系统
- 收藏夹
### Could Have(资源充足时)
- 商品评分
- 个性化推荐
### Won't Have(明确不做)
- ❌ 多语言(仅中文)
- ❌ 原生 APP(仅 H5)
- ❌ 直播带货
- ❌ 商家自助入驻
- ❌ 退款流程(人工处理)
### 范围说明
[为什么这样切?哪些是为了验证什么假设?]
Quality self-check
□ 核心业务闭环是否能跑通(不能有断点)
□ Must 中的功能去掉任何一个,闭环是否会断
□ Should/Could 是否真的可后置(不是"应该有但偷偷觉得不能没有")
□ Won't 是否明确写出(不能模糊带过)
□ 一句话能不能说清楚 MVP 是什么
□ 范围切分是否服务于验证某个假设
Common pitfalls
- MVP scope too large——wanting to build a complete platform in the first version
- Must is all features——forgetting non-functional requirements (performance, security, observability)
- No Won't——as a result, requirements get inserted halfway through development
- The closed loop has breakpoints——for example, having "place order" but no "payment"
- Putting "might be useful" into Must——loss of priority control
- No hypothesis validated——an MVP should validate some business/product hypothesis, not "build something first and see"
- Should and Could are indistinguishable——blurry boundaries make subsequent version planning difficult
Supporting templates
templates/mvp-scope-template.md— MoSCoW classification + non-goals + one-page MVP brief
Collaboration with other skills
上游:
opportunity-tree → 提供候选方案
prioritization → 提供优先级评分(辅助 MoSCoW 判断)
平行:
prd-writing → MVP 范围进入 PRD 第 5 节
pol-probe → 高不确定的 Must 先做验证实验
下游:
转交项目经理 → 按优先级拆排期
Must 范围转交 UI/UX/API/开发 → 开始执行