SuperAPI AI Directory

hardware-tdd

Testing & quality

View repository

Updated 10-16 01:58

About this skill

Hardware TDD

Build the test ladder before claiming a feature is complete. Pure behavior can often be tested off-target; voltage, pin mux, timing under load, and physical assembly still require target evidence.

Intake

Record exact board/revision, framework/toolchain, hardware invariants, safety inhibits, simulator model, available instruments, test fixtures, and the proof stage required by the user.

Process

  1. Turn requirements into observable behavior and safety invariants.
  2. Write host tests for pure C/C++ logic using fakes for time, serial, sensors, and actuators. Keep hardware adapters thin.
  3. Use Wokwi or another simulator only for peripherals and timing that its model actually represents; record model limitations.
  4. Run an exact-board compile and static checks with the selected toolchain.
  5. Create a one-change target checklist: power-off continuity, controlled power-up, input observation, output inhibit, reset/recovery, and logs.
  6. Ask a physical gate for measurements, photos, or serial output. Do not infer target success from a host test or compile log.
  7. Record failures as evidence and keep the next test bounded.

Test matrix

Layer Example Proves Does not prove
Host debounce/state/packet parser deterministic logic pin voltage or wiring
Simulation modeled sensor/LED/UART modeled interactions regulator, clone, EMI, thermal behavior
Build exact FQBN/environment source and dependency compile upload or behavior
Target serial, meter, scope, photo observed hardware behavior field reliability unless loaded
System integrated load/failure case requirement under scenario future deployment safety

Anti-rationalization

Shortcut Response
"The unit test passed." Keep all physical and system stages open.
"Wokwi matches the board." List what the model omits and verify those items on hardware.
"The sketch compiled." Require upload identity and target observations separately.
"The photo proves it works." Require board identity, measurement context, and observed result.
"Mark it done and test later." Keep the loop item blocked or needs-review until evidence exists.

Verification

  • Every requirement maps to a test, proof stage, and artifact path.
  • Host/simulation/build/target/system results are labeled separately.
  • Physical-only steps emit the concrete Physical gate format from embedded-project-loop.
  • Failed and unverified cases remain visible in the report.

Shared output contract

Use the shared Arduino skill contract: state assumptions, required tools and versions, implementation steps, tests/evidence by proof stage, known limitations, and recovery/security notes.