Load context
On first use: Read ../../CLAUDE.md to obtain scenario-level configuration (alert rules/escalation matrix/responsibility assignment).
/kpi-alert-handling — KPI alert handling
Examples
→ Example: The user says "accounts receivable turnover days triggered a red alert, exceeding the 90-day upper limit"; the system should invoke this skill, analyze the cause, and provide handling recommendations.
→ Example: The user says "gross margin alerted, but the business says it is because a major project delivery was delayed, not a real problem"; the system should invoke this skill to distinguish between real risks and definition differences.
→ Example: The user says "the monthly close lead time exceeded the standard, and this month it was two days late again"; the system should invoke this skill, analyze the reasons for the delay, and formulate an improvement plan.
Alert grading definition
预警等级:
🔴 红线预警(Red):达成率 < [X]%(如 70%),或连续 [X] 期未达标
🟡 黄线预警(Amber):达成率 < [X]%(如 85%),或单期异常波动 >[X]%
⚠️ 蓝线预警(Blue):趋势恶化,连续 [X] 期环比下降
预警类型:
跌破阈值:实际值跌破预设目标线
异常波动:短期内大幅波动,超出正常范围
趋势恶化:连续 [X] 期走势与目标背离
Step 1: Alert confirmation
Confirm alert information:
□ KPI 名称:[名称]
□ 预警类型:[跌破阈值/异常波动/趋势恶化]
□ 预警等级:[🔴红线/🟡黄线/⚠️蓝线]
□ 当前值:[X]
□ 预警阈值:[X]
□ 触发时间:[YYYY-MM-DD HH:MM]
□ 目标值:[X]
□ 缺口:[X](当前 - 目标)
□ 达成率:[X]%
Verify data accuracy:
□ 数据来源:[系统名称]
□ 数据最新时间:[YYYY-MM-DD HH:MM]
□ 数据异常排查:[✅ 数据确认 / ⚠️ 需核实]
Step 2: Impact assessment
Impact scope assessment:
□ 对公司级目标影响:
→ 关联的公司 KPI:[KPI 名称]
→ 影响幅度:[X]%(预计拖累公司 KPI 达成率 [X]%)
□ 对财务影响(如适用):
→ 收入影响:[±X] 万
→ 利润影响:[±X] 万
→ 现金流影响:[±X] 万
□ 对业务连续性影响:
→ 客户影响:[有/无] — [描述]
→ 运营影响:[有/无] — [描述]
Urgency determination:
□ 紧急程度:[🔴 紧急 / 🟡 一般 / ⚠️ 观察]
□ 须在 [X] 小时内响应:[是/否]
Step 3: Root cause analysis
Data-level analysis:
□ 近期数据趋势:
| 期间 | 目标值 | 实际值 | 达成率 | 趋势 |
|--------|--------|--------|--------|------|
| [上期] | [X] | [X] | [X]% | — |
| [本期] | [X] | [X] | [X]% | [↑↓—] |
□ 波动分析:
→ 实际 vs 预期:[±X]%(偏离度)
→ 是否在正常波动范围内:[✅ 是 / 🔴 否]
Business-level analysis:
□ 外部因素:
→ 市场环境变化:[有/无] — [描述]
→ 竞争对手行动:[有/无] — [描述]
→ 政策/监管变化:[有/无] — [描述]
□ 内部因素:
→ 执行问题:[有/无] — [描述]
→ 资源不足:[有/无] — [描述]
→ 计划变更:[有/无] — [描述]
Root cause determination:
□ 根因(最可能的原因):[描述]
□ 次要原因:[描述]
□ 置信度:[高/中/低] — 依据 [说明]
Step 4: Formulate response measures
Short-term measures (execute immediately):
□ 措施 1:[描述]
→ 责任人:[姓名]
→ 执行期限:[YYYY-MM-DD]
→ 预计效果:[X](对 KPI 达成率的改善)
□ 措施 2:[描述]
→ 责任人:[姓名]
→ 执行期限:[YYYY-MM-DD]
→ 预计效果:[X]
Medium-term measures (within [X] days):
□ 措施:[描述]
→ 责任人:[姓名]
→ 执行期限:[YYYY-MM-DD]
→ 预计效果:[X]
Target adjustment assessment (if necessary):
□ 是否建议调整目标:[是/否]
□ 调整理由:[描述]
□ 调整方案:目标值从 [X] 调整为 [X]
□ 调整后达成率预估:[X]%
□ 调整须经:[审批人] 审批
Step 5: Alert closure tracking
Alert tracking plan:
□ 追踪频率:[每日/每周]
□ 追踪指标:[X]
□ 预警关闭条件:达成率恢复到 ≥ [X]%
□ 下次追踪日期:[YYYY-MM-DD]
Alert tracking record:
| 追踪日期 | KPI 值 | 达成率 | 趋势 | 措施执行状态 | 预警状态 |
|---------|--------|--------|------|------------|---------|
| [日期1] | [X] | [X]% | [↑↓—] | [已执行 X/Y] | [🔴/🟡/⚠️] |
| [日期2] | [X] | [X]% | [↑↓—] | [已执行 X/Y] | [🔴/🟡/⚠️] |
Step 6: Generate alert handling report
═══════════════════════════════════════
KPI 预警处理报告
KPI:[KPI 名称]
预警类型:[类型]
预警等级:[🔴红线/🟡黄线/⚠️蓝线]
处理日期:[YYYY-MM-DD]
═══════════════════════════════════════
【预警信息】
□ 当前值:[X] | 目标值:[X] | 达成率:[X]%
□ 预警阈值:[X] | 触发时间:[时间]
【影响评估】
□ 紧急程度:[🔴/🟡/⚠️]
□ 对公司目标影响:[高/中/低]
□ 财务影响:[±X] 万
【根因分析】
□ 根因:[描述]
□ 置信度:[高/中/低]
【应对措施】
□ 短期措施:[X] 项 — 责任人 [姓名]
→ 措施1:[描述] — 期限 [日期]
→ 措施2:[描述] — 期限 [日期]
□ 中期措施:[X] 项 — 责任人 [姓名]
【目标调整建议】
□ 建议:[是/否] — [理由]
【追踪计划】
□ 追踪频率:[频率]
□ 预警关闭条件:达成率 ≥ [X]%
□ 下次追踪:[日期]
═══════════════════════════════════════
置信度:[✅ 高 / ⚠️ 中 / 🔴 低]
预警状态:[🔴 预警中 / 🟡 处理中 / ✅ 已关闭]
═══════════════════════════════════════
Escalation trigger conditions
- Alert level is 🔴 red line
- Root cause cannot be confirmed within [X] days
- No improvement within [X] days after short-term measures are executed
- Target value must be adjusted
- The alert involves multiple related KPIs deteriorating simultaneously
- Impact amount > [X] ten thousand
Finance Skills — kpi-alert-handling atomic skill