SuperAPI AI Directory

rhdh-test-plan-review

Testing & quality

View repository

Updated 10-16 01:28

About this skill

RHDH test-plan review

Compare the version tables and key dates a test-plan issue carries against what the lifecycle sources and the release schedule actually say, then apply what the user accepts.

Read first. Nothing reaches Jira until the user has walked the diff row by row and approved a stated set of writes.

Route

  1. Resolve the plan key or URL and the target RHDH version.
  2. Load workflows/review-test-plan.md and follow it end to end.
  3. Load references/sources.md at Step 4 — it holds every lifecycle URL and the extraction rules per product.
  4. Load references/google-sheets-setup.md only when schedule access fails.

Named-skill handoffs

Invoke each by name and use what it reports. Never read, execute, or locate a sibling skill's files. When a named skill is absent, say so and name the review dimension that stays unverified.

Need Skill
The plan issue, its linked issues, ownership, labels, and status /rhdh-jira-api
Supported OCP, Kubernetes, PostgreSQL, RHBK, and Quay versions /rhdh-platform-lifecycle
Feature Freeze, Code Freeze, and GA dates /rhdh-release-schedule
What is still open against the release /rhdh-release-status
Editing the plan description or posting a comment /rhdh-jira-update
Creating a child task /rhdh-jira-create

scripts/check_gsheets.py and scripts/fetch_schedule.py are this skill's own schedule adapters, not cross-skill interfaces. gog keeps Google credentials behind its native interface.

What the review reports

State the plan key and the release version, then, for every platform and integration row and every key date:

  • the current value, the suggested value, and the lifecycle or schedule source behind the suggestion;
  • rows left unchanged, and why;
  • rows the review could not evaluate, naming the source or skill that was unavailable.

A row with no suggested version is a gap. A row whose source could not be read is unverified. Neither may be dropped, and neither may be reported as the other.

Writing to Jira

Editing the description, posting a comment, and creating child tasks are writes. Follow /mutation-gate: state each operation with its target ticket and the exact ADF document, comment body, or child-task title it will land; get approval for that stated set; execute; then report every operation as completed, failed, or skipped. A failed operation stops the workflow and is reported, never retried into a different shape.

Completion

Complete when every platform row, integration row, and key date in the plan carries a verdict — changed, unchanged, or unverified — and every suggested value cites the lifecycle source or schedule tab behind it. Gaps and unverified rows are listed separately; a row may not be omitted from both. When the user asked to publish, complete only after every approved write has been reported by target and outcome, including the ones that were skipped.