SuperAPI AI Directory

11-content-calendar

Office & productivity

View repository

Updated 10-16 08:04

About this skill

90-Day Content Calendar Generator

Turns approved pillars, campaigns and seasons into a dated 90-day plan of what goes out on which platform, for the client lead and the production team. Apply east-african-english for tone throughout.

Use When

  • Pillars, themes and campaigns are agreed and the team needs a dated, post-by-post plan of what goes out on which platform, month by month.
  • The schedule must include Ugandan and East African public holidays and observances such as Independence Day, international awareness days and industry seasonal hooks.
  • Campaign windows need blocking out so promotions and always-on posts do not clash.
  • The client wants a weekly rhythm template, a posting schedule showing each post's approval status, and a pre-publish check that samples posts before they go live.

Do Not Use When

  • playbook-content-production for the drafting, design, approval and batching workflow.
  • 10-content-pillars when the recurring themes are not yet agreed.
  • 12-website-content-plan for blog and website articles.
  • Stop before scheduling or publishing to live accounts; hand over the calendar for client approval.

Required Inputs

Artefact Source/provider Required? If absent
Approved pillars with percentages 10-content-pillars output or client sign-off Yes Stop; route to 10-content-pillars rather than inventing themes.
Platforms in scope and posting frequency per platform Channel plan or client lead Yes Default to Facebook, Instagram and WhatsApp and label the frequency provisional.
Campaign windows (name and dates) 09-campaign-strategy or client If campaigns run Mark no [CAMPAIGN] weeks and note that none were supplied.
Three high-revenue seasons and the calendar start Monday Client or consultant Yes Ask the seasonal-hook question; never guess the client's peak periods.
Location and the year's variable observance dates (Ramadan, the Eids) Client; a dated official calendar Yes Default to Kampala, Uganda; mark unconfirmed lunar dates not assessed.
Production capacity and approval owner Client lead Yes Cap volume at stated capacity; return the calendar as an approval draft.

Workflow

  1. Confirm the intake answers (pillars, platforms, frequency, campaigns, seasons, start date, location); stop if the pillars are not approved and route to 10-content-pillars.
  2. Fix the 13-week grid from the start Monday, then place [CAMPAIGN], [HIGH SEASON] and [OBSERVANCE] weeks before any always-on content.
  3. Select 6–10 awareness days relevant to the industry and state why each was chosen.
  4. Set the weekly rhythm template, then fill the Month 1, 2 and 3 tables with one row per platform per week per pillar, each with a specific headline, a two-sentence brief, an owner and an approval status.
  5. Write the cross-platform theme under each month and check the 10-4-1 ratio per month.
  6. Run the stratified-sampling pre-publish check; batch-fix any failure type seen twice, then re-sample and rerun until a sample is clean (escalate at round 3).
  7. Run the anti-slop ship gate and hand the calendar to the client lead as an approval draft; withhold release while a blocking date, permission or evidence defect remains.

Outputs

Artefact Consumer Acceptance condition
Weekly rhythm template and three monthly tables (W1–W13) with owners and approval status Client lead; playbook-content-production Every row has a specific headline, pillar, platform, format, two-sentence brief and owner; no placeholder rows.
Month overviews with cross-platform themes and 10-4-1 ratio notes Client lead Each month states its focus, tone, events and measured ratio.
Selected awareness days with reasons Client lead 6–10 days chosen, each tied to the client's industry.

Evidence Produced

Evidence Format Acceptance condition
Observance and date register Table in the deliverable Every variable date is confirmed from a dated source or marked not assessed.
Sampling QC record Table: round, sample size, failure types, batch-fixes A clean round is recorded before hand-off; a bare "reviewed" claim does not pass.

Capability and Permission Boundaries

Read and search only; analysis is read-only. Publishing, spend, live account changes, outreach and personal-data processing need explicit, action-specific client authority. Scheduling posts in a live tool is out of scope; the calendar goes to the client for approval.

Degraded Mode

Without confirmed pillars or observance dates, return the narrowest qualified result and mark the affected checks not assessed. A dated 13-week grid with campaign and season blocks can still be delivered, with topic rows held for the approved pillars.

Decision Rules

Condition Action Failure or risk avoided
A campaign window overlaps always-on content Let the campaign lead: cut pillar posts that week and add one supporting organic post per platform. Mixed messages and paid/organic duplication.
A week falls in a high-revenue season Raise posting frequency by 20–30 % and brief at least two seasonal posts per platform. Missing the client's biggest demand window.
An observance is solemn (Uganda Martyrs Day) or religious (Ramadan) Acknowledge rather than promote; during Ramadan reduce promotion and avoid daytime food imagery where relevant. Cultural offence and brand damage.
A variable lunar date is unconfirmed Confirm the year's date from a dated source or mark it not assessed; never carry last year's date. An Eid greeting on the wrong day.
A month's ratio drifts towards promotion Rebalance towards about 10 value, 4 brand and 1 promotional per 15 rows (Bodnar and Cohen, 2012). A calendar the audience reads as advertising.
A sampled failure type appears more than once Treat it as systematic; fix every matching row, not only the sampled ones. The same error shipped across dozens of rows.

Quality Standards

  • All three monthly tables are produced; no month is skipped or abbreviated.
  • Every row has a specific topic or headline; none says "TBC" or "educational post".
  • Observances in the window are included with tone guidance; 6–10 awareness days carry a stated reason.
  • Campaign weeks are marked and defer to the campaign.
  • Each week's cross-platform content shares a theme without identical copy.
  • The 10-4-1 ratio is noted per month and the calendar is not mainly promotional.
  • The sampling QC record states sample size, failure types, batch-fixes and the converging round.
  • British English; dates in day-month-year form (for example 7 April 2026).

Anti-Patterns

  • Inserting a generic post on an observance and calling it culturally relevant. Fix: write a brief that suits the occasion's tone, or leave the day out.
  • Reusing last year's Eid or Ramadan dates. Fix: confirm the current year's dates before generating.
  • Pasting the same copy across platforms and calling it a cross-platform theme. Fix: vary format, day and angle per platform under one weekly theme.
  • Sampling only Month 1 in the pre-publish check. Fix: spread the sample across all three months and every platform in scope.
  • Treating the calendar as a locked schedule. Fix: review it every Friday for reactive posts, follow-ups and approval timing.
  • Scheduling posts in a live tool during planning. Fix: hand the calendar over for approval; publishing needs separate authority.

References