SDLC Planning Skill

Use When

  • Generate Planning & Management documentation for SDLC projects. Covers Project Vision & Scope, SDP, SCMP, QA Plan, Risk Plan, SRS, and Feasibility Study. Use when starting a new project, conducting project governance, or establishing the planning...
  • The task needs reusable judgment, domain constraints, or a proven workflow rather than ad hoc advice.

Do Not Use When

  • The task is unrelated to sdlc-planning or would be better handled by a more specific companion skill.
  • The request only needs a trivial answer and none of this skill's constraints or references materially help.

Required Inputs

  • Gather relevant project context, constraints, and the concrete problem to solve; load templates only as needed.
  • Confirm the desired deliverable: design, code, review, migration plan, audit, or documentation.

Workflow

  • Read this SKILL.md first, then load only the referenced deep-dive files that are necessary for the task.
  • Apply the ordered guidance, checklists, and decision rules in this skill instead of cherry-picking isolated snippets.
  • Produce the deliverable with assumptions, risks, and follow-up work made explicit when they matter.

Quality Standards

  • Keep outputs execution-oriented, concise, and aligned with the repository's baseline engineering standards.
  • Preserve compatibility with existing project conventions unless the skill explicitly requires a stronger standard.
  • Prefer deterministic, reviewable steps over vague advice or tool-specific magic.

Anti-Patterns

  • Treating examples as copy-paste truth without checking fit, constraints, or failure modes.
  • Loading every reference file by default instead of using progressive disclosure.

Outputs

  • A concrete result that fits the task: implementation guidance, review findings, architecture decisions, templates, or generated artifacts.
  • Clear assumptions, tradeoffs, or unresolved gaps when the task cannot be completed from available context alone.
  • References used, companion skills, or follow-up actions when they materially improve execution.

Evidence Produced

Category Artifact Format Example
Release evidence SDLC planning document set Markdown docs covering Project Vision & Scope, SDP, SCMP, QA Plan, and Risk Plan docs/sdlc/planning-2026-04-16.md

References

  • Use the templates/ directory when the task needs a structured deliverable.

Generate a complete Planning & Management documentation suite for software development projects. This skill produces 7 foundational documents that establish the project baseline before any code is written.

Load Order

  1. Load world-class-engineering.
  2. Load this skill to define the planning baseline and phase-entry gates.
  3. Pair it with engineering-management-system, advanced-testing-strategy, and deployment-release-engineering when the plan must be executable.

Executable Planning Standard

Planning documents must define more than scope. They must define:

  • critical flows and risk class
  • measurable success criteria and service expectations
  • delivery slices and release assumptions
  • testing, observability, and rollback expectations
  • ownership for decisions, operations, and follow-up

When to Use

  • Starting a new SaaS project and need a governance baseline
  • Establishing project planning documents for stakeholders or investors
  • Conducting a feasibility study before committing resources
  • Setting up configuration management and quality assurance processes
  • Creating a software development plan for the team
  • Building a risk management framework for an upcoming project
  • Preparing a full-system SRS (not just requirements interview or Android-only)

When NOT to Use

  • Gathering raw requirements via interview -- use project-requirements skill instead
  • Planning a single feature (spec + implementation) -- use feature-planning skill
  • Planning an Android companion app (PRD, SDS, API Contract) -- use mobile-saas-planning skill
  • Writing design documents (SDD, architecture, database design) -- use sdlc-design skill
  • Writing test plans with test cases -- use sdlc-testing skill
  • Writing deployment or user documentation -- use sdlc-user-deploy skill

Document Inventory

# Document File Purpose Audience Length
1 Project Vision & Scope templates/project-vision-scope.md Establish the "why" and "what" Stakeholders, sponsors, investors 15-30 pages
2 Software Development Plan templates/software-development-plan.md Management & technical approach PM, dev leads, QA 20-40 pages
3 Configuration Management Plan templates/configuration-management-plan.md Change & version control processes DevOps, dev leads, release mgrs 15-25 pages
4 Quality Assurance Plan templates/quality-assurance-plan.md Quality processes & standards QA team, devs, PM 15-25 pages
5 Risk Management Plan templates/risk-management-plan.md Identify, assess, mitigate risks PM, stakeholders, dev leads 15-25 pages
6 Software Requirements Spec templates/software-requirements-spec.md Full functional & non-functional requirements Devs, QA, stakeholders, architects 30-60 pages
7 Feasibility Study Report templates/feasibility-study-report.md Viability analysis before commitment Decision makers, investors, sponsors 15-30 pages

Generation Workflow

Generate documents in this order. Each builds on the previous.

Step 1: Gather context (use project-requirements skill if not done)
    |
Step 2: Feasibility Study Report (Go/No-Go decision)
    |
Step 3: Project Vision & Scope (approved vision)
    |
Step 4: Software Requirements Specification (full requirements)
    |
Step 5: Software Development Plan (how to build it)
    |
Step 6: Configuration Management Plan (how to manage changes)
    |
Step 7: Quality Assurance Plan (how to ensure quality)
    |
Step 8: Risk Management Plan (what can go wrong)

Prerequisites

Before generating any documents, gather or confirm:

Input Source Required?
Project name & domain User interview Yes
Target market & users User interview Yes
Core feature list project-requirements output or user Yes
Tech stack decisions Project context or defaults Yes
Budget & timeline constraints User or stakeholder Recommended
Existing system inventory Codebase audit If migrating
Regulatory requirements User or domain research If applicable

Cross-References to Existing Skills

Upstream Skills (use BEFORE this skill)

Skill Relationship
project-requirements Gathers raw requirements via guided interview. Feed its output (requirements.md, business-rules.md, user-types.md, workflows.md) into this skill's SRS and Vision documents.

Parallel Skills (use ALONGSIDE this skill)

Skill Relationship
feature-planning For individual feature specs and implementation plans. This skill covers project-level planning; feature-planning covers feature-level planning.
vibe-security-skill Security baseline for all web applications. Reference in QA Plan and Risk Plan.

Downstream Skills (use AFTER this skill)

Skill Relationship
mobile-saas-planning For Android companion app planning (PRD, SDS, API Contract). Uses this skill's SRS as input.
multi-tenant-saas-architecture Backend architecture patterns. Uses SDP and SRS as input.
modular-saas-architecture Pluggable module architecture. Uses SRS module inventory.
saas-seeder Bootstrap the SaaS template. Uses requirements from SRS.
sdlc-design Design documentation phase. Uses approved SRS as primary input.
sdlc-testing Testing documentation. Uses SRS requirement IDs for test case traceability.

Future skills to add (identified from ISO/IEC 14764-2006): Software Maintenance Plan (Corrective/Adaptive/Perfective/Preventive maintenance types) and Post-Deployment Evaluation Report are not yet implemented as skills but should be generated at project close.

Available SDLC Skills

Skill Phase Documents
sdlc-design Design SDD, Database Design, API Design, UI/UX Spec
sdlc-testing Testing Test Plan, Test Cases, V&V Plan, Test Report, Peer Review

Available SDLC Skills (continued)

Skill Phase Documents
sdlc-user-deploy Delivery User Manual, Deployment Guide, Release Notes, Training Plan

Adaptation Rules

SaaS vs Standalone

Aspect Multi-Tenant SaaS Standalone App
Data isolation Row-level via franchise_id Not applicable
Auth model Dual auth (Session + JWT) Single auth model
Deployment 3-env (dev/staging/prod) May be simpler
Scaling Per-tenant growth planning Single-instance scaling
SRS sections Include NFR-MT (multi-tenancy) Omit multi-tenancy NFRs
Risk register Include tenant data leakage risks Omit tenant-specific risks

Android + Web vs Web-Only

Aspect Android + Web Web-Only
SRS scope Include mobile NFRs (offline, app store) Web NFRs only
SDP Include Android build pipeline Web pipeline only
SCMP Include Gradle + PHP configs PHP configs only
QA Plan Include Android testing (Compose UI, JUnit 5) Web testing only
Risk Plan Include app store rejection risks Omit mobile risks

MVP vs Full Product

Aspect MVP Full Product
Vision scope P0 features only P0 + P1 + P2 features
SDP phases 2-3 phases 5-8 phases
SRS depth Core modules only All modules
Feasibility Focus on technical + economic All five feasibility types
Risk register Top 10 risks Comprehensive (20-30 risks)

Output Structure

When generating documents for a project, create this structure:

docs/planning/
├── 01-feasibility-study.md
├── 02-project-vision-scope.md
├── 03-software-requirements-spec.md
├── 03-srs/
│   ├── functional-requirements.md
│   ├── non-functional-requirements.md
│   └── traceability-matrix.md
├── 04-software-development-plan.md
├── 05-configuration-management-plan.md
├── 06-quality-assurance-plan.md
└── 07-risk-management-plan.md

Each file must stay under 500 lines. Split into subdirectories as needed.

Phase Gate Exit Criteria

Every project passes through six risk-based milestones (Disciplined Agile, 2020). Each milestone has mandatory exit criteria verified before proceeding. These map to the six DA milestones.

Gate DA Milestone Triggered By Exit Criteria
G1 Stakeholder Vision End of Skill 01–03 Vision documented; stakeholder register complete; scope agreed with Out of Scope listed; domain confirmed
G2 Proven Architecture End of Skill 04 Interface spec complete; architecture strategy selected; key risks identified; no unresolved [CONTEXT-GAP] tags
G3 Requirements Complete End of Skill 05 All FRs have GWT stubs; all NFRs have SMART metrics; every FR traced to business goal; zero [V&V-FAIL] tags
G4 Logic Validated End of Skill 06–07 All LaTeX formulas verified; attribute mapping complete; no conflicts in Section 3.4
G5 Audit Passed End of Skill 08 Zero [V&V-FAIL], [GLOSSARY-GAP], [TRACE-GAP], [SMART-FAIL] tags; SRS approved by consultant
G6 Production Ready Post-testing Test plan complete; no open must-fix defects; Go/No-Go approved in phase exit meeting

Anti-pattern: Advancing to the next gate without resolving all tags from the current gate propagates defects downstream. One unresolved [V&V-FAIL] at G3 typically generates 5–10 downstream rework items.

Quality Checklist

Run after generating all documents:

  • All 7 documents generated (or justified why one was skipped)
  • Each document stays under 500 lines (split if needed)
  • Vision & Scope has measurable success metrics with numeric targets
  • SRS has numbered requirement IDs (FR-MOD-001, NFR-PERF-001)
  • SRS Section 1.2 includes an explicit ## Out of Scope subsection
  • Every NFR is SMART: Specific, Measurable, Achievable, Relevant, Time-bound — flag [V&V-FAIL: SMART metric not defined] for any that are not
  • Every SHALL requirement has an inline acceptance stub: **Acceptance:** Given [state], When [action], Then [outcome]
  • Requirements are prioritized using MoSCoW; time-sensitive features additionally scored with Cost of Delay
  • SDP references the correct tech stack with version numbers
  • SCMP describes the actual Git branching strategy being used
  • QA Plan references vibe-security-skill for security quality gates
  • Risk Register includes at least 8 pre-populated SaaS-specific risks
  • Feasibility Study ends with a clear Go/No-Go/Conditional recommendation
  • All documents cross-reference each other where relevant
  • Multi-tenant isolation addressed in SRS, QA Plan, and Risk Plan
  • Deployment environments (Windows dev, Ubuntu staging, Debian prod) documented in SDP
  • Release, rollback, and post-deploy observation assumptions are documented in the plan set
  • No vague language ("user-friendly", "fast", "secure") -- all measurable
  • Examples are tailored to the project's actual tech stack and domain

Anti-Patterns (What NOT to Do)

Anti-Pattern Why It Fails Do This Instead
Skip feasibility, jump to coding Wastes resources on unviable projects Always do feasibility first
Copy-paste generic templates Documents don't match your project Customize every section to your context
Write SRS without stakeholder input Requirements will be wrong Use project-requirements skill first
No measurable success metrics Can't tell if project succeeded Define KPIs with specific numeric targets
Ignore multi-tenant requirements Data leakage between tenants Always include NFR-MT requirements
One massive document Exceeds 500-line limit, hard to maintain Split into index + sub-files
No risk register Risks become surprises Pre-populate with common SaaS risks
Skip configuration management Deployment chaos, lost changes Document branching, releases, migrations
Write plans and never update them Plans become stale and useless Review and update at each phase gate
Omit Out of Scope section from SRS Scope creep is invisible SRS Section 1.2 must include explicit ## Out of Scope subsection
Vague NFRs without SMART metrics Cannot verify or test non-functional requirements Each NFR must be Specific, Measurable, Achievable, Relevant, Time-bound
No Given-When-Then acceptance stubs Requirements written without verification linkage Add inline **Acceptance:** Given [state], When [action], Then [outcome] to every SHALL requirement
Prioritize only by gut feel High-value work delayed; delivery misaligned with business Use Cost of Delay (CoD) for time-sensitive requirements alongside MoSCoW

Template Files

Each template provides the complete structure, section-by-section guidance, example excerpts, anti-patterns, and a quality checklist.

  1. Project Vision & Scope
  2. Software Development Plan
  3. Configuration Management Plan
  4. Quality Assurance Plan
  5. Risk Management Plan
  6. Software Requirements Specification
  7. Feasibility Study Report