SuperAPI AI Directory

database-reliability

Data & analytics

View repository

Updated 10-16 08:03

About this skill

Database Reliability Engineering

Acknowledgement: Shared by Peter Bamuhigire, techguypeter.com, +256 784 464178.

Use When

  • Database reliability engineering: SLOs for databases, operational runbooks, change management, capacity planning, backup verification, incident response, and monitoring strategies for production MySQL. Use when setting up production database...
  • The task needs reusable judgment, domain constraints, or a proven workflow rather than ad hoc advice.

Do Not Use When

  • The task is unrelated to database-reliability or would be better handled by a more specific companion skill.
  • The request only needs a trivial answer and none of this skill's constraints or references materially help.

Required Inputs

  • Gather relevant project context, constraints, and the concrete problem to solve; load references only as needed.
  • Confirm the desired deliverable: design, code, review, migration plan, audit, or documentation.

Workflow

  • Read this SKILL.md first, then load only the referenced deep-dive files that are necessary for the task.
  • Apply the ordered guidance, checklists, and decision rules in this skill instead of cherry-picking isolated snippets.
  • Produce the deliverable with assumptions, risks, and follow-up work made explicit when they matter.

Quality Standards

  • Keep outputs execution-oriented, concise, and aligned with the repository's baseline engineering standards.
  • Preserve compatibility with existing project conventions unless the skill explicitly requires a stronger standard.
  • Prefer deterministic, reviewable steps over vague advice or tool-specific magic.

Anti-Patterns

  • Treating examples as copy-paste truth without checking fit, constraints, or failure modes.
  • Loading every reference file by default instead of using progressive disclosure.

Outputs

  • A concrete result that fits the task: implementation guidance, review findings, architecture decisions, templates, or generated artifacts.
  • Clear assumptions, tradeoffs, or unresolved gaps when the task cannot be completed from available context alone.
  • References used, companion skills, or follow-up actions when they materially improve execution.

Evidence Produced

Category Artifact Format Example
Operability Database SLO record Markdown doc per skill-composition-standards/references/slo-template.md covering query latency, availability, and replication-lag SLOs docs/data/db-slo.md
Operability Backup verification log Markdown doc tracking restore-test runs and recovery-time measurements docs/data/backup-verify-log.md

References

  • Use the references/ directory for deep detail after reading the core workflow below.

Core Philosophy

Databases are not special snowflakes. Treat every node as cattle: replaceable, automated, and monitored. The DBRE role is engineering, not firefighting. Toil (manual, repetitive, automatable work that scales linearly with growth) is the enemy — eliminate it.


1. Database SLOs

Availability Targets

Tier SLO Downtime/Year Downtime/Week
Standard 99.9% 8.7 hours 10.08 minutes
High 99.95% 4.4 hours 5.04 minutes
Critical 99.99% 52 minutes 1 minute

Sample SLO: 99.9% availability averaged over one week; no single incident >10.08 minutes; downtime declared when >5% of users affected; one annual 4-hour maintenance window (2 weeks notice, <10% users).

Latency SLOs

Never use averages — they are lossy and hide tail latency. Use percentiles over 1-minute windows at 99% of requests.

p50 < 5ms   (pk lookups)  |  p95 < 50ms (indexed queries)
p99 < 200ms (joins/agg)   |  max 500ms  (circuit breaker)

Replication and Connection SLOs

Replication lag:     <5s normal | alert 10s | critical 30s
Connections:         <80% of max_connections (alert), >20% headroom required
Slow query rate:     <1% of total queries

Error Budget

Track weekly. 30% consumed by Tuesday → create ticket. 70% consumed with 3+ days left → freeze non-critical deployments. 99.9% SLO = 604.8 seconds budget per week.

SELECT ROUND(SUM(duration_seconds) / 604.8, 1) AS budget_pct_used
FROM downtime_log WHERE week_start = CURDATE() - INTERVAL WEEKDAY(CURDATE()) DAY;

Platform SRE for Databases

SRE — overview and positioning

SRE applies the SLO / error-budget / postmortem loop to operations work. This section turns database operations from "best effort" into a measurable, budgeted activity. Read it after the existing content on backups, replication, and query tuning, because the SLIs reference those subsystems. For application-tier SRE mechanics (alert routing, multi-burn-rate alerting, instrumentation), cross-reference the observability-monitoring and reliability-engineering skills rather than duplicating that material here.

Per Google SRE Book ch. 4 (Jones, Wilkes, Murphy, Smith — sre.google/sre-book/service-level-objectives/):

  • An SLI is "a carefully defined quantitative measure of some aspect of the level of service that is provided".
  • An SLO is "a target value or range of values for a service level that is measured by an SLI".
  • An SLA "includes consequences of meeting (or missing) the SLOs".

Database SLIs

Concrete SLIs a production DB must track:

  • Query P95 latency (ms) — histogram_quantile(0.95, sum(rate(mysql_query_duration_seconds_bucket[5m])) by (le)) for MySQL; pg_stat_statements for PostgreSQL
  • Replication lag (seconds) — MySQL Seconds_Behind_Master, PostgreSQL pg_last_wal_replay_lsn vs primary pg_current_wal_lsn
  • Connection pool utilisation — sum(pool_active_connections) / sum(pool_max_connections) per service
  • Deadlock rate — MySQL SHOW ENGINE INNODB STATUS deadlock counter, PostgreSQL deadlocks in pg_stat_database
  • Error rate — query errors per minute, grouped by error class

Database SLOs

Example SLO targets for a production SaaS DB:

  • Query P95 ≤ 100ms for 99.5% of requests over 28 days
  • Availability ≥ 99.95% (downtime ≤ 20.16 minutes per 28d)
  • Replication lag P95 ≤ 5 seconds over 28d
  • Error budget: (1 - 0.995) × 28d = 3h 22min of query-latency-breach allowed per 28d

Error Budget Tracking and Policy

Per Google SRE Workbook, "Implementing SLOs" (Thurgood, Ferguson, Hidalgo, Beyer — sre.google/workbook/implementing-slos/):

the error budget is 100% minus the SLO

A 99.9% availability SLO yields a 0.1% budget — about 43 m 12 s per 30 days. The error budget policy is "a policy outlining what to do when your service runs out of budget" (same source). For a database tier, the typical policy actions are:

Budget state Action
≥ 50% remaining normal change cadence
25–50% remaining review every change for SLO impact; high-risk changes require sign-off
< 25% remaining freeze schema changes and config changes; permit only reliability fixes
Exhausted full freeze; postmortem the incident(s) that consumed the budget; resume only after the budget recovers above threshold

Approval: per the SRE workbook, the policy must be agreed by product, dev, and SRE — for the data tier this means the application owner, the database team, and the platform team.

Tracking mechanics:

  • Replication lag budget: allow max 1 hour of lag > 30 seconds per month. Alert at 50% burn.
  • Query latency budget: alert at 2% budget burn in 1 hour (fast burn) or 10% in 6 hours (slow burn). For multi-window multi-burn-rate alerting mechanics, see observability-monitoring.
  • Publish a weekly SLO report (Grafana snapshot) to the engineering channel.

Sample SLO definition YAML (Sloth-compatible):

version: "prometheus/v1"
service: "mysql-primary"
slos:
  - name: "query-latency-p95"
    objective: 99.5
    description: "P95 query latency under 100ms"
    sli:
      events:
        error_query: "sum(rate(mysql_query_duration_seconds_bucket{le='0.1'}[5m]))"
        total_query: "sum(rate(mysql_query_duration_seconds_count[5m]))"
    alerting:
      name: MySQLQueryLatencyP95
      page_alert:
        labels:
          severity: critical
      ticket_alert:
        labels:
          severity: warning

Chaos Engineering for Databases

Controlled drills to run quarterly in staging (never prod without a rollback plan):

  • Primary failover drill — promote replica, measure RTO, verify application auto-reconnect
  • Connection pool exhaustion — open connections until pool is saturated, confirm circuit breaker trips
  • Replica lag injection — SELECT pg_sleep(60) on replica to simulate 60s lag; confirm read traffic falls back to primary
  • Disk full simulation — fill test volume to 95%, confirm alerts fire and read-only mode kicks in
  • Query killer test — run a runaway SELECT SLEEP(300) and confirm the query killer terminates after 30s

Record every drill in a runbook with observed RTO/RPO.

Blameless Database Postmortem

Per Google SRE Book "Postmortem Culture" (Lunney, Lueder, O'Connor — sre.google/sre-book/postmortem-culture/):

For a postmortem to be truly blameless, it must focus on identifying the contributing causes of the incident without indicting any individual or team for bad or inappropriate behavior.

Required template sections (synthesised from the same chapter):

  • Title and date
  • Authors and reviewers
  • Status (draft / review / final)
  • Summary (one paragraph)
  • Impact (customers affected, duration, financial impact if quantifiable)
  • Timeline (UTC, machine-readable)
  • Root cause and contributing factors
  • Detection (how the incident was detected; was there an alert; lead time)
  • Response (what worked, what didn't)
  • Lessons learned (what went well / poorly / where we got lucky)
  • Action items (owner, due date, ticket link)

Anti-patterns: blaming an individual; "human error" as a root cause without a system-level contributing factor; action items without owners or dates; postmortems that never close.

Facilitation rules: one facilitator (not the on-call who handled the incident); recorded timeline before discussion; all participants agree to "we acted in good faith with the information available at the time".

Worked example template

# Postmortem: <incident title>

- Date: YYYY-MM-DD
- Severity: SEV1/2/3/4
- Duration: HH:MM (start → resolved)
- Services affected:
- Authors:

## Timeline (UTC)

- HH:MM first alert fired
- HH:MM on-call acknowledged
- HH:MM root cause identified
- HH:MM mitigation applied
- HH:MM service restored

## Root Cause (5-Whys)

1. Why did service degrade? Query latency jumped
2. Why did query latency jump? Missing index on new column
3. Why was the index missing? Migration added column without CREATE INDEX
4. Why did migration ship without the index? Review did not catch it
5. Why did review not catch it? No migration-review checklist in PR template

## Action Items

- [ ] Add migration-review checklist to PR template — owner, JIRA-XXXX, due YYYY-MM-DD
- [ ] Run pt-online-schema-change to add the missing index — owner, JIRA-XXXX, due YYYY-MM-DD

## What Went Well / What Went Poorly

- Went well: alert fired within 2 min; runbook was up to date
- Went poorly: no schema-change CI gate; post-deploy smoke test did not exercise the new query

Toil Identification and Automation

Tasks that must be automated away (anything repeated > 2 times per month):

  • Backup verification — cron job that restores yesterday's backup to a scratch instance and runs a checksum query
  • Index maintenance — pt-online-schema-change scheduled via Ansible for large-table DDL
  • Stale connection cleanup — pg_terminate_backend on connections idle > 1 hour with open transactions
  • Log rotation and retention — logrotate configured via Ansible role

Runbook Structure

Every DB runbook must follow this structure:

# Runbook: <alert name>

- Severity: SEV1/2/3
- Trigger: <PromQL or alert condition>
- SLA to acknowledge: < 5 min for SEV1

## Investigation

1. <command to run first>
2. <metric or log to check>
3. <decision tree>

## Resolution

1. <primary mitigation>
2. <rollback steps if mitigation fails>

## Escalation

- Primary on-call → Secondary → DBRE lead → VP Engineering
- External: DB vendor support (ticket URL)

## Related

- Grafana dashboard URL
- Recent postmortem links
- Vendor docs

Escalation Policies

Severity definitions, PagerDuty Incident Response (response.pagerduty.com/before/severity_levels/):

  • SEV-1: "Critical issue that warrants public notification and liaison with executive teams."
  • SEV-2: "Critical system issue actively impacting many customers' ability to use the product."
  • SEV-3: "Stability or minor customer-impacting issues that require immediate attention from service owners."
  • SEV-4: "Minor issues requiring action, but not affecting customer ability to use the product."
  • SEV-5: "Cosmetic issues or bugs, not affecting customer ability to use the product."

PagerDuty also notes that when in doubt during an active incident, "treat it as the more urgent level rather than debating the distinction" (same source).

Paging tiers for the database tier:

  • SEV-1/2: page primary on-call DBA + platform on-call + incident commander; open war-room channel.
  • SEV-3: ticket primary on-call; respond within business hours unless aging breaches SLO.
  • SEV-4/5: backlog.

Runbook hand-off:

  • Every page links to a runbook URL.
  • Hand-off between on-call rotations: written status of open incidents, in-flight changes, and known noisy alerts. Verbal hand-off without a written record is a defect.

War-room conventions:

  • One channel per incident, named with the incident ID.
  • Roles assigned: Incident Commander, Communications, Operations (per PagerDuty's role definitions on response.pagerduty.com).
  • Decisions logged in-channel; chat history is the source of truth for the postmortem timeline.

Game Days and DB-tier Chaos (lightweight)

Lightweight scope: only what applies directly to MySQL/PostgreSQL operations. Generic chaos-engineering platforms (Chaos Mesh, Litmus, etc.) belong in the Kubernetes platform skill, not here.

Scenario What it tests
Promote a replica (planned failover drill) replication health, app reconnection, DNS / proxy switchover
Kill primary (SIGKILL mysqld / postgres) failover automation, runbook accuracy, alert fan-out
Disk-full on primary monitoring of disk SLI, runbook for emergency cleanup
Slow network (10% packet loss between primary and replica) replication-lag SLO, alert thresholds
Restore from backup to a scratch host RTO measurement; backup integrity (links to existing backup section)

Cadence: quarterly minimum. Every game day produces a written report in the same template as a postmortem. Tooling: mysqladmin, pg_ctl, iptables, and tc (traffic control) cover the scenarios above; derive command sequences per environment.

For deeper SRE / SLO theory and burn-rate alerting math, see references/sre-slo.md and the reliability-engineering and observability-monitoring skills.


Additional Guidance

Extended guidance for database-reliability was moved to references/skill-deep-dive.md to keep this entrypoint compact and fast to load.

Use that deep dive for:

  • 2. Toil Reduction — What to Automate
  • 3. Change Management for Databases
  • 4. Backup Verification Runbook
  • 5. Monitoring Pyramid
  • 6. Alert Fatigue Prevention
  • 7. Capacity Planning
  • 8. Incident Response Runbook
  • 9. Connection Exhaustion Response
  • 10. Replication Failure Recovery
  • 11. Security Incident Response
  • 12. Planned Maintenance Checklist
  • 13. Chaos Engineering for Databases
  • Additional deep-dive sections continue in the reference file.