SuperAPI AI Directory

frontend-harness-slides

Frontend & websites

View repository

Updated 10-16 07:56

About this skill

Frontend Harness Slides

Build HTML slides that survive iteration. This skill does not provide a starter project or require React, Vite, Tailwind, Playwright, or any other stack. Its unit is the harness contract: stable frame address, registry, fixed stage, frozen mode, audit surface, visual checks, and verified handoff.

Pre-Build Alignment

Use explicit user requirements. An inferred or recommended default is a working plan, not an explicit user requirement. For a small edit with clear requirements to an existing deck, preserve the current stack, deck root, and visual system except where the user requests a change, and proceed.

Inspect discoverable facts first: source material, the existing deck, the repo, a deployed URL, and project files. Ask only unresolved decisions that materially affect the result or scope. Do not re-ask a path, style, stage, stack, density, navigation, or delivery target the user already gave.

When the brief is still vague, treat alignment as focused grilling: purpose and audience, content boundary and story, presentation format and density, then the remaining execution constraints. Keep each round on the next highest-impact unknown. Ask in normal chat text, with a recommended answer, rationale, and impact. Group related low-risk questions when that reduces back-and-forth. Do not call AskUserQuestion, AskQuestion, request_user_input, or any structured single-choice, multiple-choice, or form-style prompt. Candidate options may clarify a real directional choice, but they stay as plain text.

Cover these decisions at the level the task needs. This is a decision surface, not a confirmation ritual:

  • Content plan: scope, non-goals, orientation, presentation format, duration, and content mix.
  • Design plan: style, density, audit profile, motion direction, visual references, and whether a preview would reduce visual uncertainty.
  • Project location plan: the deck root, whether it is new, existing, inside a parent repo, an independent repo, or temporary, and which files are expected there. Use a path the user already gave or the existing deck's root. A user home directory or other broad workspace is not a reliable long-term deck root. If a long-term deliverable has no reliable specified target, recommend one exact path and confirm before scaffolding. Do not scaffold into the current working directory just because the agent started there.
  • Build plan: fixed stage, navigation/touch expectations, technology stack, source material, and delivery target. Do not publish or deploy without authorization.
  • Testing plan: test runner, test command, and required coverage across render, frame addressing, navigation, interaction isolation, layout safety, runtime errors, assets/fonts, and build/export/deployment checks. Testing is required for created or modified HTML slide artifacts; do not present it as a preference to confirm.
  • Context document plan: where the Context document will live, when it will be updated, and whether the user wants a different location.

Follow the user's explicit choice to make or skip a style preview. Otherwise, recommend one when unresolved visual choices would benefit from comparison; proceed without one when the style is clear or the edit preserves the visual system. For open-ended style selection, use a three-candidate preview mix: Density-Fit, Safe, and Wildcard. Choose those candidates from the user's material, audience, density, formality, risk level, delivery target, and visual references. Read references/style/index.md first, then load only the individual style files needed for shortlisted candidates.

During open style choice, send the Live Demo link as a reference: https://frontend-harness-slides-workbench.vercel.app/. It is a dynamic Workbench Demo with preset styles, transitions, animations, and motion examples. It does not replace a content-specific preview and is not a required extra question.

Keep alignment details as implementation constraints, not slide copy. Do not render duration, audience, density, stage size, delivery target, navigation requirements, or implementation notes on the slide surface unless the user asks.

For delivered slide work or multi-turn implementation, create or update a Context document when useful state needs to survive beyond chat, unless the user explicitly declines. The deck root owns source, assets, tests, and delivery commands; the Context document tracks decisions and progress. Follow the user's or repo's existing context convention; otherwise use project docs for delivered decks and a temp path for explorations. Treat context as memory, not control.

If the user gives a reference URL, deployed deck, or source repository, inspect it before choosing stage, scaling, animation, and interaction contracts.

Reference Loading

If the task is exploratory discussion, answer from this file and load only the needed reference. Once the task is an HTML slide build, import, or substantial edit, read the stage references before implementation:

  1. references/01-plan.md
  2. references/style/index.md
  3. references/02-design.md
  4. references/03-build.md
  5. references/04-verify-and-ship.md

Do not build from SKILL.md alone once production implementation starts. The references are the single source of truth for planning detail, visual systems, harness implementation, verification, deployment, and handoff.

Use references/01-plan.md when shaping an actual intake prompt; this file only lists the decision surface.

File Use for
references/01-plan.md Intake, defaults and alternatives, context, narrative/content mix, source material, registry draft, visible-copy boundary.
references/style/index.md Flat, tagged style catalog with progressive loading, canonical preview mix, semantic-to-visual mapping, and per-style Design DNA links.
references/02-design.md Style previews, style presets, layout variation, navigation design, fonts/CJK, assets, components, copy quality.
references/03-build.md Stable frames, registry, fixed/mobile stage, navigation, frozen mode, motion, interaction, implementation pitfalls.
references/04-verify-and-ship.md Audit profiles, visual smoke, production smoke, mobile/WebKit coverage, deployment, PDF/static handoff, final report.

Branches

  • New slide artifact: align, plan, preview if useful, establish the harness contracts the work needs, build, verify, and ship.
  • Imported or source-heavy deck: treat source material as content and intent, not layout preservation; rebuild narrative, registry, assets, and scenes.
  • Existing deck: preserve existing stack and conventions; adapt the harness contracts instead of replacing the project style.

Project And Stack

Use the deck root for slide project files. The deck root is the filesystem directory that owns the deck source, package/config files, assets, tests, and delivery commands. For a new deck, prefer a new clean directory; an existing deck project, a subdirectory inside a parent repo, an independent repo, or a temporary exploration path is fine when that is the target. Do not scatter files into a non-empty directory or scaffold into the current working directory just because the agent started there. If the root is inside a broad workspace or parent repo, check that key generated files are tracked or ignored as expected.

Prefer the user's existing stack. For a new deck with no preference, React + Vite + Playwright is a reasonable default, but the skill's identity is the harness contract, not any framework or test library.

NO TEST-FREE OR UNDER-TESTED SLIDE OUTPUTS. Every created or modified HTML slide artifact must have a runnable test command and a sufficient multi-angle test suite before delivery. Required coverage includes render and visible stage content, frame addressing, navigation, interaction isolation, layout safety, runtime errors, assets/fonts, and build/export/deployment behavior when relevant. Use a TDD-style flow by default: establish the test entry early, then implement and verify the harness, navigation, layout, interaction, and export-risk areas in small steps.

Harness Contracts

Read references/03-build.md before implementing or adapting a harness. A deck is ready to iterate only when these contracts exist:

  • Stable frame address: every scene and meaningful beat can be opened directly by stable id/state.
  • Registry: tooling can enumerate scene order and beat counts without scraping visible text.
  • Fixed stage: slide content is authored inside a fixed-ratio stage that scales as a whole.
  • Frozen mode: tests can render deterministic settled states.
  • Audit surface: checks can catch route mismatch, missing/collapsed content, overflow, asset/font failures, console/runtime errors, and interaction leaks.
  • Visual baseline: screenshots or equivalent visual checks exist where pixel drift matters.

Working Loop

  1. Detect the branch: new slide artifact, imported/source-heavy, or existing deck.
  2. Align and plan with references/01-plan.md; create or update the Context document when the work is delivered or multi-turn.
  3. Design with references/02-design.md; selected style means a visual system, not one repeated template.
  4. Build with references/03-build.md; preserve the harness contracts in the chosen stack, keep tests moving with the implementation, and update the Context document after major implementation milestones.
  5. Verify and ship with references/04-verify-and-ship.md; deliver a live URL, PDF/static export, or both according to the delivery target, then record final delivery and verification status in the Context document when one exists.

Treat local servers as previews unless the user explicitly asks for local-only work. Treat the work as ready only after the relevant final check passes, or after skipped checks and residual risks are reported clearly.

Anti-Patterns

  • Starting implementation from a vague prompt.
  • Re-asking a path, style, or other decision the user already made.
  • Treating the agent's own recommendations or inferences as explicit user requirements.
  • Blocking on confirmation of defaults that do not change result or scope.
  • Rendering internal planning context on the slide surface.
  • Treating this skill as a mandate for a specific framework.
  • Creating or modifying HTML slide artifacts without a runnable test command and sufficient multi-angle tests.
  • Using viewport breakpoints inside the fixed stage.
  • Rendering whole static slides in canvas.
  • Treating beats as decorative fades instead of story states.
  • Renaming stable scene ids casually after links or baselines exist.
  • Skipping verification after layout, motion, font, asset, shared visual, or harness changes.