SuperAPI AI Directory

code-review

Testing & quality

View repository

Updated 10-16 02:35

About this skill

Review of the change against a fixed point the user supplies, along two axes (a third, Journey, checks a delivery slice rather than a diff; see Journey axis):

  • Standards — does the code conform to this repo's documented coding standards?
  • Contract — does the code meet the ticket's acceptance criteria, implement every signature the ticket lists, and keep those signatures as written?

Both diff axes run as parallel sub-agents so they don't pollute each other's context, then this skill aggregates their findings.

Process

1. Pin the fixed point

Whatever the user said is the fixed point — a commit SHA, branch name, tag, main, HEAD~5, etc. If they didn't specify one, ask for it.

For committed work capture git diff <fixed-point>...HEAD (three-dot, against the merge-base). For work still in progress capture git diff <fixed-point> (tracked staged and unstaged changes) and read any untracked files in scope explicitly. Note the commits via git log <fixed-point>..HEAD --oneline. Keep the worktree path in both reviewer briefs.

Before going further, confirm the fixed point resolves (git rev-parse <fixed-point>) and the effective change is non-empty, including untracked files. A bad ref or empty change should fail here — not inside two parallel sub-agents. A review run for /implement is low on size:xs and medium otherwise; both require independent reviewers. Low uses the same two axes but focuses on the small fix and its regression test rather than adjacent design advice.

2. Identify the contract and spec source

Look for the originating ticket and contract, in this order:

  1. Issue references in the commit messages or branch name (#123, Closes #45) — resolve with gh issue view.
  2. A path the user passed as an argument.
  3. A spec file under docs/, specs/, or .scratch/ matching the branch name or feature.
  4. If nothing is found, ask the user where the spec is. If they say there isn't one, the Contract sub-agent will skip and report "no spec available".

Then look for the contract: the ticket body's ## Signatures section, which to-tickets copies from the plan (new: signatures and change: bullets). The ticket carries it because docs/plans/ is usually gitignored, so a fresh checkout lacks the plan. If the ticket has no ## Signatures section (ad hoc work, sweep, non-code), there is no contract and the Contract axis falls back to plain spec review: acceptance criteria only, as below.

3. Identify the standards sources

Anything in the repo that documents how code should be written, such as CODING_STANDARDS.md or CONTRIBUTING.md.

On top of whatever the repo documents, the Standards axis always carries the smell baseline below — a fixed set of Fowler code smells (Refactoring, ch.3) that applies even when a repo documents nothing. Two rules bind it:

  • The repo overrides. A documented repo standard always wins; where it endorses something the baseline would flag, suppress the smell.
  • Always a judgement call. Each smell is a labelled heuristic ("possible Feature Envy"), never a hard violation — and, like any standard here, skip anything tooling already enforces.

Each smell reads what it is → how to fix; match it against the diff:

  • Mysterious Name — a function, variable, or type whose name doesn't reveal what it does or holds. → rename it; if no honest name comes, the design's murky.
  • Duplicated Code — the same logic shape appears in more than one hunk or file in the change. → extract the shared shape, call it from both.
  • Feature Envy — a method that reaches into another object's data more than its own. → move the method onto the data it envies.
  • Data Clumps — the same few fields or params keep travelling together (a type wanting to be born). → bundle them into one type, pass that.
  • Primitive Obsession — a primitive or string standing in for a domain concept that deserves its own type. → give the concept its own small type.
  • Repeated Switches — the same switch/if-cascade on the same type recurs across the change. → replace with polymorphism, or one map both sites share.
  • Shotgun Surgery — one logical change forces scattered edits across many files in the diff. → gather what changes together into one module.
  • Divergent Change — one file or module is edited for several unrelated reasons. → split so each module changes for one reason.
  • Speculative Generality — abstraction, parameters, or hooks added for needs the spec doesn't have. → delete it; inline back until a real need shows.
  • Message Chains — long a.b().c().d() navigation the caller shouldn't depend on. → hide the walk behind one method on the first object.
  • Middle Man — a class or function that mostly just delegates onward. → cut it, call the real target direct.
  • Refused Bequest — a subclass or implementer that ignores or overrides most of what it inherits. → drop the inheritance, use composition.

4. Spawn both sub-agents in parallel

Standards sub-agent prompt — include:

  • The full diff command, any untracked-file paths, and commit list.
  • The list of standards-source files you found in step 3, plus the smell baseline from step 3 pasted in full — the sub-agent has no other access to it.
  • The brief: "Report — per file/hunk where relevant — (a) every place the diff violates a documented standard: cite the standard (file + the rule); and (b) any baseline smell you spot: name it and quote the hunk. Distinguish hard violations from judgement calls — documented-standard breaches can be hard, but baseline smells are always judgement calls, and a documented repo standard overrides the baseline. Skip anything tooling enforces. Under 400 words."

Contract sub-agent prompt — include:

  • The diff command, any untracked-file paths, and commit list.
  • The path or fetched contents of the ticket (or other spec), including its ## Signatures section when one exists.
  • The brief: "Report: (a) acceptance criteria or requirements that are missing, partial, or look implemented but wrong; (b) behaviour in the diff that wasn't asked for (scope creep). Quote the ticket line for each finding. With a contract also report: (c) every new: signature or change: bullet in the ticket's ## Signatures that the diff does not implement; (d) signature diff: compare each declaration the diff adds for a new: signature (name, parameters, return types, visibility) against the ticket's block, and flag every mismatch that is not tied to a contract-change issue (match gh issue list --label contract-change --state all against the issue numbers in the commits and PR body, or an issue naming the changed symbol). A signature edit with no such issue is a violation, not a judgement call. Under 400 words."

If neither a ticket nor a spec is available, skip the Contract sub-agent and note this in the final report. If a required reviewer cannot be launched or its report cannot be read, report the review as blocked; never replace that axis with the implementer's own judgement or claim it passed.

5. Aggregate

Present the reports under ## Standards and ## Contract headings (Contract covers acceptance criteria, signature coverage and the signature diff; without a contract, acceptance criteria only), verbatim or lightly cleaned. Do not merge or rerank findings — the axes are deliberately separate (see Why separate axes).

End with a one-line summary: total findings per axis, and the worst issue within each axis (if any). Don't pick a single winner across axes — that's the reranking the separation exists to prevent.

Journey axis

A third axis, separate from Standards and Contract. It does not review a diff: it runs once per delivery slice, on integrated code, when /fleet reconcile finds the slice's last ticket merged. Run it as its own sub-agent, never inside the two above, so a passing diff cannot mask a broken journey.

Input is one PRD journey (title, surface, steps, final → <observable state>) and the evidence gathered for it: the output of running its steps. Missing or empty evidence counts as needs human eyes, never pass. Report, per journey:

  • Pass: the evidence shows the → end state. Quote the evidence line that shows it.
  • Fail: the evidence contradicts the end state or stops before it. Quote the step where it diverged.
  • Needs human eyes: the end state is visual UI, or the evidence cannot show it. List what the user should look at. Never guess pass or fail from output that cannot show the state.

Why separate axes

A change can pass one axis and fail another:

  • Code that follows every standard but implements the wrong thing → Standards pass, Contract fail.
  • Code that does exactly what the issue asked but breaks the project's conventions → Contract pass, Standards fail.

Reporting them separately stops one axis from masking another.