SuperAPI AI Directory

supply-knowledge-retrieve

Data & analytics

View repository

Updated 11-03 10:03

About this skill

Supply Knowledge Retrieve

Purpose

Enrich the disruption payload with grounded supply context: the ERP/MRP position for the part (on-hand, on-order, safety stock, lead time), the supplier master (single-source flag, approved alternates, substitutes), the BOM/where-used mapping and the open production/sales orders that consume the part, and the supplier's on-time delivery history (to reveal a chronic pattern).

When to use

  • After disruption-intake, in every run.
  • "Where is this part used and what's our on-hand?" / "has this supplier been late before?".

Inputs

  • disruption-intake.json (contract inputs from disruption-intake).
  • ERP inventory/MRP export (CSV): part, on_hand, on_order, safety_stock, lead_time_days.
  • Supplier master (CSV): single_source, alternate suppliers + lead times, approved substitutes.
  • BOM/where-used (CSV): parent product, component, per-unit qty, line.
  • Open orders (CSV): order_id, type (production/sales), product, finished_qty, need_by, customer.
  • Supplier on-time history (CSV): prior POs, promised vs actual, days late.

Steps

  1. Populate supply{}: on_hand, on_order (the delayed PO qty), safety_stock, lead_time_days, single_source, substitutes[] (with approved + available_qty), alternates[] (with lead_time_days + qualified).
  2. Explode the BOM/where-used and join to open orders into retrieved.open_orders[]: each with order_type, product, line, finished_qty, per_unit, need_by, customer, high_runner.
  3. Populate history{}: window_days, late_count, on_time_pct, prior_shipments[], and set chronic_pattern = true when the supplier is repeatedly late (a systemic signal).
  4. Attach supplier master + sourcing standards into retrieved{}, each with a citation.

Output

The contract payload with populated supply{}, retrieved{} and history{} — the input to shortage-impact-map.

Grounding requirements

Every open order cites its order record; every supply figure cites the ERP/master export; every prior shipment cites its PO row.

Constraints

  • Retrieval only — do not map impact or choose a mitigation here (engine/LLM split).
  • Do not infer an approved substitute or a qualified alternate the master does not state.
  • Do not drop an open order (especially a customer sales order) that a shortage would hit; surfacing it is the point.

Escalation / uncertainty

  • If the where-used, open-order or supplier-master data is unavailable, proceed on the PO and on-hand alone and note it in escalations[]; do not block the run.