Bridge Contract

This skill is the defining layer of spec-superflow.

It converts planning artifacts into a single execution handshake:

  • execution-contract.md

Use templates/execution-contract.md as the baseline structure.

Use This Skill When

Invoke this skill when the user says things like:

  • "now implement it"
  • "we are ready to build"
  • "turn this plan into execution rules"
  • "prepare the handoff"
  • "refresh the contract"
  • "the spec changed, update the execution contract"

Input Artifacts

Read:

  • proposal.md
  • specs/
  • design.md
  • tasks.md
  • docs/artifact-contract.md

Do not rely on chat memory as a substitute for these files.

Auto-Extraction via Artifact Parsing

When available, use structured artifact parsing to auto-extract contract fields. This produces a more accurate and complete contract than manual copying.

Parse proposal.md for Intent & Scope

Extract by parsing the proposal's structure:

  • Intent Lock: Read ## Why section → compress into the "Problem being solved" field. Read ## What Changes → compress into "In scope" list.
  • Scope Fence: Read ## Scope > ### Out of Scope → directly populate the "Out of scope" field.
  • Non-Goals: Any explicit non-goals from the proposal → include verbatim.

Parse specs/ for Test Obligations

Extract by iterating through each spec file:

  • Approved Requirements Summary: For each requirement with SHALL/MUST, extract the requirement name and a one-sentence summary.
  • Key Scenarios: For each #### Scenario: block, extract the scenario name.
  • Acceptance Checks: Each scenario's THEN clause becomes an acceptance check.
  • Test Obligations: Any requirement that describes observable behavior → must start with a failing test.

Parse design.md for Constraints

Extract by parsing the design's structure:

  • Architecture Constraints: Read ## Decisions → each decision's "Choice" becomes a constraint.
  • Interface Constraints: Read ## Risks And Trade-Offs → interface-related risks become constraints.
  • Dependency Constraints: Read ## Context > Constraints → dependency-related items become constraints.
  • Data Constraints: Any data format, schema, or migration notes → capture as constraints.

Parse tasks.md for Batches

Extract by parsing the task structure:

  • Execution Batches: Group numbered tasks by their major section (1.x → Batch 1, 2.x → Batch 2).
  • Completion Definitions: For each batch, derive "Done when" from the tasks' acceptance criteria.
  • Review Timing: Identify natural review points between batches.

Manual Extraction Fallback

If the parsing engine is unavailable (no Node.js or runtime constraints), manually extract using the mapping rules below. The manual extraction must be equally thorough — cross-check each extracted field against the source artifact.

Mapping Rules

From proposal.md

Extract:

  • intent lock
  • scope fence
  • non-goals

From specs/

Extract:

  • approved behavior summary
  • required scenarios
  • test obligations

From design.md

Extract:

  • implementation constraints
  • interface constraints
  • dependency constraints

From tasks.md

Extract:

  • execution batches
  • completion definitions
  • review timing

Cross-Check: Requirement Coverage

Before finalizing the execution contract, perform a coverage check:

  1. List every requirement (SHALL/MUST statement) from specs/
  2. Check each requirement against the contract:
    • Is it reflected in the Approved Behavior section?
    • Is there a corresponding test obligation?
    • Is it represented in at least one execution batch or acceptance check?
  3. If a requirement is not covered by a test obligation or batch, flag it in the contract's "Escalation Rules" section.
  4. If a requirement spans multiple batches, note the dependency in the batch descriptions.

Output requirement: The contract must explicitly state if any requirement could not be mapped. Do not silently drop requirements.

Purpose

The execution contract is not a duplicate planning document.

It must compress planning into execution-ready rules:

  • what cannot drift
  • what must be tested first
  • where review is mandatory
  • when implementation must stop and return to planning

Contract Writing Standard

The resulting execution-contract.md must make it obvious:

  • what behavior is approved
  • what is explicitly out of scope
  • which constraints implementation must obey
  • how work is grouped into execution batches
  • which tests must fail first before code is written
  • which conditions force a rewind to planning

Prefer compression and operational clarity over repeating every planning detail.

Approval Model

This skill prepares implementation readiness. It does not silently authorize implementation.

After drafting or refreshing the contract:

  1. summarize the important handoff rules
  2. identify anything still ambiguous
  3. highlight any requirements that could not be mapped to test obligations or batches
  4. ask the user to approve the contract explicitly

Only after explicit approval may the workflow move to execution-governor.

Stale Contract Detection

Refresh the contract if any of the following are true:

  • scope changed in proposal.md
  • approved requirements changed in specs/
  • architecture or interface constraints changed in design.md
  • execution batches changed materially in tasks.md
  • the current contract no longer matches what the team intends to build

Hotfix Mode: Minimal Contract

When workflow is hotfix, generate a minimal execution-contract.md containing only:

  1. Intent Lock — one-sentence description of the change intent
  2. Task List — numbered list of tasks to complete
  3. Approval Gate — DP-3 prompt for user confirmation

Skip: Scope Fence, Build Rules, Review Gates, Test Evidence requirements.

The minimal contract still requires explicit user approval (DP-3) before execution begins.

Reference: docs/decision-points.md → DP-3

Guardrails

  • Do not continue to implementation if major ambiguity remains.
  • Do not approve the execution contract on the user's behalf.
  • After generating the contract, ask the user to review it.
  • Implementation begins only after explicit approval.
  • Do not skip execution-contract.md just because the planning docs look complete.
  • Do not write production code inside this skill.
  • If the coverage cross-check reveals unmapped requirements, flag them explicitly in the contract and in the approval summary.

After Contract Generation

After execution-contract.md is written and validated:

  1. Run: node scripts/spec-superflow.mjs state init <change-dir>
  2. This creates .spec-superflow.yaml with artifacts_hash and contract_hash
  3. The state file enables fast staleness detection in subsequent phases

Output Standard

Your response should include:

  1. a brief statement that the bridge is being created or refreshed
  2. the key intent lock and scope fence
  3. the most important test obligations
  4. the main review or rewind triggers
  5. any requirements that could not be mapped to test obligations or batches (coverage gaps)
  6. a direct request for user approval