SuperAPI AI Directory

etsi-directives

General & other

View repository

Updated 11-11 19:21

About this skill

ETSI Directives — Version 53 (1 September 2026)

Author: ETSI (Institut Européen des Normes de Télécommunication) | Pages: 286 | Instruments: 17 + version history | Chapters: 13 | Generated: 2026-10-05

How to Use This Skill

  • Without arguments — load core frameworks for reference
  • With a topic — ask about standstill, weighted national voting, FRAND, modal verbs, or another indexed topic; I find and read the relevant chapter
  • With chapter — ask for ch11; I load that specific chapter
  • Browse — ask "what chapters do you have?" to see the full index

When you ask about a topic not covered in Core Frameworks below, I will read the relevant chapter file before answering.


Core Frameworks & Mental Models

1. The Directives are 17 instruments in one compilation (Ch 1)

Never cite "the Directives" — name the instrument and its clause; numbering restarts per instrument. Ask who adopts it before asking what it says, because the adopting body sets the change threshold:

Adopted by Instruments Amendment route
Heads of National Delegations Statutes; Rules of Procedure Specially Convened GA, ≥ 6 weeks' notice; ≥ 75 % (Statutes) / ≥ 71 % (RoP) of total weighted votes
General Assembly Values; Codes of Conduct; Delegated Powers; Financial Regulations; ToR of FC and GoSR GA
Board Board Working Procedures; ToR of OCG; TWP*; IPR Guide*; Antitrust Guidelines*; Honours Board, or agreed at a GA meeting (*)
Director-General Information Policy; ETSI Drafting Rules Director-General

Guides explain; Policies bind. The Guide on IPR states the Policy "takes precedence in all cases"; the Information Policy is expressly non-normative.

2. Voting: subject matter picks the procedure (Ch 3, RoP Art. 11.2)

  • 11.2.1 Weighted National Voting (National Delegations, Annex 3 weights): dissolution; RoP disputes; EN adoption/withdrawal; Statutes/RoP amendments; new National Delegation weightings.
  • 11.2.2 Weighted Individual — Full members: Full-member rights/admonition/termination; EU-regulatory documents; EU standardization policies; EU-only Work Programme priorities.
  • 11.2.3 Weighted Individual — Full + Associate: everything else (the default).
  • ≥ 71 % of votes cast; abstentions and non-votes are excluded; one vote per Academic/Corporate/Public Group (the last cast counts); a weighted vote cannot be split (Annex 7's Board elections excepted).
  • Quorum: ≥ 40 % of Full-member weighted votes; plus ≥ 50 % of National-Delegation weight for 11.2.1. Proxy: written notice ≥ 17 h, max 3 per decision.
  • Consensus first in all bodies; minority rights protected; secret ballot is the norm and never waivable for expulsions and officer elections.

3. Organs and membership (Ch 2–3)

  • Statutes: ETSI is a French 1901-law non-profit association; CEPT-area establishment is required for Full membership; Associate and Observer cover other cases; admission runs on a four-times-yearly Consensus poll with dues at 100/75/50/25 %.
  • General Assembly is the highest authority (38 enumerated powers); Board acts for it between meetings within 35 delegated powers; Director-General holds chief executive authority and is the only person entitled to speak for the Institute publicly.
  • Expulsion: non-payment → Director-General; other substantial breach → General Assembly, with registered-letter notice and an opportunity to be heard.

4. How a standard gets made (Ch 11, TWP)

  • A Work Item is the atom: one responsible Technical Group, one named Rapporteur, ≥ 4 Full/Associate supporters, one deliverable per WI, and the WI must be adopted before any final draft is approved. A WI shall be stopped after one year without progress.
  • Body types: EP (market sector, limited duration), TC (technical area, no term limit), EPP (external partners, approves its own deliverables, own legal status/budget), ISG (fast lane, GR/GS only, no EC/EFTA-mandated work), SDG (software, no ETSI Deliverables).
  • Approval routes: EN → ENAP (NSOG vote, after Standstill + Public Enquiry) or SRdAP (NSBG, SReq-derived); ES/EG → MAP (all-member vote, 14 → 30 → 60 → 10 days); TS/TR → Technical Body adoption only.
  • Technical-group votes: Consensus first, then ≥ 71 % of votes cast — if that fails, recalculate on Full members' votes alone; no quorum, no proxy, no splitting.

5–9. IPR, antitrust, conduct, board and finance, drafting

The remaining frameworks are in references/core-frameworks.md:

  • 5. The IPR regime is FRAND, not royalty-free (Ch 4) — disclosure duties, essentiality test, FRAND undertakings, Chairs' Annex C duties.
  • 6. Antitrust: a standards meeting is also a competitors' meeting (Ch 5) — forbidden topics, the appearance principle, reporting duty.
  • 7. Conduct and the opening ritual (Ch 6) — ETSI Values, the seven principles, Chair and Board duties.
  • 8. Board, finance and committees (Ch 7–10) — quorum and voting, 21-day correspondence votes, inclusive budget, committee ToRs.
  • 9. Drafting deliverables (Ch 13, EDR) — modal verbs are the legal effect, skeleton mandate, protected clauses, transposition table.

Chapter and Topic Index

references/indexes.md holds the full lookup tables: the chapter index (13 chapters with their key frameworks) and the topic index (~40 topics mapped to chapters, e.g. standstill → ch03, FRAND → ch04, Work Items → ch11).

Supporting Files


Scope & Limits

This skill covers the Directives v53 (1 September 2026) only. Two extraction limitations should be kept in mind: (1) the Information Policy's per-category access tables are presented as tables/images in the source and did not survive PDF text extraction — chapter 12 records its status, scope and cross-references but not the access tables; (2) large parts of the TWP's annexes and the EDR's editorial clauses (5–9) are summarised at framework level rather than in full — consult the source for exact wording before relying on it in a formal submission. For the operative text of any provision, read the source document. The source is ETSI's own governance compilation and carries ETSI's copyright; do not redistribute extracted content.