SuperAPI AI Directory

wind-power-business

General & other

View repository

Updated 10-16 10:15

About this skill

Wind Power Business

Overview

This is the foundational framework for wind power business work. Currently accumulated Cp 计算 module: after the user provides a power curve, the script must be called first to calculate and deliver the results, rather than calculating manually or only explaining the formula.

Working Principles

  • First confirm which type of content the user currently wants to supplement, then update only the corresponding module.
  • Do not proactively expand unconfirmed business rules, financial assumptions, policy judgments, or technical conclusions.
  • Cp calculation must first confirm air density rho and rotor diameter D; if the user has not provided them, ask first, do not apply default values.
  • Before Cp calculation, only perform loose parameter suspicion checks: if air density is clearly outside 0.5-1.5 kg/m^3, or rotor diameter is clearly outside 30-350 m , ask the user for confirmation first, do not calculate directly.
  • Cp calculation must undergo physical plausibility checks; if Cp,max > 0.593, the result file must not be delivered, and you must first return to the user to confirm parameters.
  • When the model name appears to contain the rotor diameter, for example G5000-200, if the D given by the user clearly conflicts with the caliber in the model name, prompt the user to verify, do not mechanically use the number given by the user; after user confirmation, calculation may continue.
  • When involving policy, electricity price, market trading, installed capacity, bidding results, etc., verify and write in only when the user explicitly requests research or supplementation.
  • New content should be as structured as possible: applicable scenarios, input materials, processing steps, output format, precautions.
  • Preserve the boundaries between facts, assumptions, empirical judgments, and items to be confirmed.

Content Map

Read and maintain referenced files as needed; do not create empty files in advance for modules with no actual content.

  • Calculate Cp values, wind energy utilization coefficients, power coefficients, and maximum Cp values based on the power curve: read references/cp-calculation.md。

Scripts

Update Pattern

When the user requests supplementing a certain module, process in this order:

  1. Confirm the module to be accumulated and the usage scenario.
  2. Determine whether it should be written into SKILL.md, an existing reference, or a new reference.
  3. If it is a general scheduling rule, update SKILL.md。
  4. If it is business knowledge, a template, a checklist, or a methodology, update the corresponding reference.
  5. If stable repeated calculation or conversion is needed in the future, then add scripts/。

Quality Gate

After each update, check:

  • Was only the module specified by the user this time or clearly related modified?
  • Was adding business details not confirmed by the user avoided?
  • Can subsequent expansion continue item by item, rather than hard-coding the content?
  • Are clear file entry points and reference paths preserved?
  • Has the Cp calculation confirmed rho、D, wind speed unit and power unit?
  • For Cp calculation, should the user first be asked to confirm obviously abnormal rho、D or conflicting model name specifications?
  • Does the Cp calculation pass the Cp,max <= 0.593 validation?
  • If validation fails, should delivery be stopped and the user asked to verify the parameters?