When to use this skill
ALWAYS use this skill when the user mentions:
- High-performance frontend computation
- WASM vs IPC trade-offs
- Rust logic running in the WebView
Trigger phrases include:
- "WASM", "WebAssembly", "IPC", "performance"
- "WASM", "WebAssembly", "performance", "IPC"
How to use this skill
- Identify workloads suitable for WASM execution
- Build Rust code to WASM and integrate with the frontend
- Keep system API access in Rust core via IPC when needed
- Validate performance gains and bundle size impact
Outputs
- WASM integration plan
- Performance and bundle checklist
Scope
- Boundary: Frontend WASM usage only
- Key points: WASM vs IPC responsibilities
References
- https://v2.tauri.app/llms.txt
- https://crates.io/crates/tauri-wasm
- https://v2.tauri.app/develop/calling-rust/#wasm
- https://github.com/p1mo/tauri-wasm
- https://zhuanlan.zhihu.com/p/533025312
- https://blog.csdn.net/qq_63401240/article/details/147340217
Keywords
tauri wasm, rust wasm, frontend compute, performance
Common Gotchas
- Version compatibility: Pay attention to compatibility between framework versions and dependency libraries; APIs may differ across versions
- Config file format: Config file format errors are the most common issue; it is recommended to use your editor's syntax checking
- Environment variables: Ensure all necessary environment variables are set correctly, and do not hardcode sensitive information
- Dependency conflicts: Watch out for dependency conflicts when multiple versions coexist; use a lock file to pin versions
- Performance pitfalls: Pay attention to performance optimization in large-data scenarios, and avoid common issues such as N+1 queries
Usage workflow
Step 1: Environment preparation
Ensure the development environment has the necessary dependencies and tools installed.
Step 2: Configuration initialization
Perform basic configuration according to project requirements.
Step 3: Using core features
Implement core features following the example code.
Step 4: Testing and verification
Run tests to ensure functionality works properly.
Step 5: Deployment and release
After development is complete, proceed with deployment and monitoring.