SuperAPI AI Directory

build-design-library

Design & creation

View repository

Updated 10-15 21:41

About this skill

Build a Product Design Library

Build the approved product library through seven gated phases. Scope enters only through product authority or a decision owner's choice. Competitor features and generic aesthetics are evidence, never authority.

Vocabulary

  • authority — a source that binds the work: repository instructions, decision records, approved specifications, code, generated contracts, tests. Project authority outranks every generic design suggestion.
  • decision owner — the human who approves scope, identity, fallbacks, and policy changes. Silence keeps a decision open.
  • work owner — the one worker or process that may change a component, exported symbol, file, process, worktree, hostname, or route. Every item has exactly one. A work owner never approves a decision.
  • claim — a worker report, walkthrough, scanner pass, screenshot set, or implementer full-suite run. A claim proves nothing on its own.
  • receipt — an independent reviewer's recorded pass or block on a named artifact. Only a receipt accepts work. When no independent reviewer capability exists, the receipt is unreviewed: the gate stays closed, and the run reports it to the decision owner. Work never self-certifies.
  • seam — the documented boundary where implemented data ends and proposed data begins. Live proof stops at the seam.
  • cell — one route, mode, viewport, and state combination in the browser matrix. Only a valid capture proves a cell.
  • stub — a temporary fallback. It exists only with the decision owner's explicit approval evidence, one work owner, and a deletion plan (rule).

Runtime skill routing

Resolve each capability by name from the current runtime skill registry. Before its first trigger in a phase, load a skill by reading its SKILL.md through the registry; load the agent-browser tool with agent-browser skills get core. Record each capability, its loaded status, and any limit in the contract's capability table.

Trigger Skill or tool Required use
Before visual decisions or UI builds design-craft Run its brownfield scan. Shipped project tokens stay authoritative. Load each reference that its trigger requires.
Navigation, forms, decision flows, feedback, errors, onboarding, progress, or microcopy laws-of-ux Name its governing rule for each material interaction decision.
Any external research stream: reference products, source libraries, domain rules (Phase 2) research Run each stream as a background agent against primary sources. One cited Markdown file per stream, at the artifact path the brief names.
Reference-product capture: competitor pages as HTML export or full-page screenshot, PDFs, site maps (Phase 2) firecrawl scrape <url> html and scrape <url> screenshot on public pages only. Record URL, date, and access limits with each capture. Competitor interaction behavior is inferred from capture or documentation, never measured.
Before product acceptance (Phase 7) design-qa Run its scanner, then its judgment gates, then its live-verification reference. Scanner exit 0 proves only its mechanical scope.
Rendered proof of this product, from the vertical slice onward (Phases 4–7) agent-browser Measure this product's rendered surface through isolated sessions and fresh navigation.

A missing capability keeps status missing in the contract's capability table. Apply the project's own checks by hand and report them as manual.

Phase 1 — Contract

Read: references/contract.md.

Act: Fill templates/project-contract.md. Discover policies, scope, shipped assets, data, routes, commands, roster, tools, and owner choices.

Exit gate: Every item in Contract completion holds.

Phase 2 — Research and sourcing

Read: references/research.md. Read references/component-sourcing.md before any library recommendation, copy, adaptation, or installation.

Act: Route nonoverlapping research for reference products, source libraries, owned code, and domain rules. Use templates/helper-brief.md and templates/research-capture-license.md.

Exit gate: Every item in Research completion holds.

Phase 3 — Coverage, data, and owner decisions

Read: references/design-and-data.md.

Act: Complete these records:

Exit gate: Every item in Coverage completion holds. An unresolved owner choice stops the affected work.

Phase 4 — Foundations and vertical slice

Read: references/build.md; keep it loaded through Phase 5. Read Run live browser proof before the slice's browser check.

Act: Build foundations. Then prove one thin path from data through the gallery and a real application route.

Exit gate: The Foundation gate and the Vertical slice gate both pass.

Phase 5 — Component families

Read: Continue references/build.md.

Act: Build only accepted dependency nodes. Brief each family worker with templates/helper-brief.md. Assign one work owner to each component, shared symbol, shared file, process, and worktree. Route integration through one serial integration owner.

Exit gate: Every in-scope family passes Family completion.

Phase 6 — Gallery and application integration

Read: references/verification.md; keep it loaded through Phase 7.

Act: Integrate navigable gallery sections and real application routes. Use coherent scenarios. Exercise style generation, assets, authentication, API paths, route ownership, and supported startup behavior.

Exit gate: Every item in Integration completion holds.

Phase 7 — Acceptance and handoff

Read: Continue references/verification.md.

Act: Run static checks, rendered checks, real journeys, independent review, project quality roles, and the full project gate. Work through templates/integration-cleanup-handoff.md.

Exit gate: Every item in Acceptance completion holds.

Final report

Fill the handoff record in templates/integration-cleanup-handoff.md. Label every proof item as a claim or a receipt. A claim names its kind: walkthrough, scanner run, screenshot, or worker report.