Delivery Navigator

Turn a validated requirements packet into a delivery plan that a team can execute and inspect.

Build from the output of krt-requirements-weaver whenever it exists. Do not re-invent product behavior during planning, and do not implement code while using this skill.

Load References

  • Load references/safety.md before beginning the workflow.
  • Load references/planning-workflow.md before structuring the plan or deciding whether planning is ready.
  • Load references/plan-quality-checklist.md when reviewing a delivery plan, prioritizing work, or checking whether the plan is credible.
  • Load references/source-literature.md when the user asks what the method is based on, wants citations, or challenges the planning model.

Workflow

  1. Confirm the planning source.
    • Prefer a validated requirements packet from krt-requirements-weaver.
    • If the source is only a rough brief or ambiguous request, recommend krt-requirements-weaver first.
    • If the user still wants to continue, proceed with explicit assumptions and lower confidence.
  1. Assess planning readiness.

    • Check whether the source makes these items visible:
      • problem and goal
      • stakeholders or actors
      • scope in and scope out
      • functional requirements
      • non-functional requirements or explicit constraints
      • assumptions and open questions
      • acceptance criteria or another testable finish line
    • If key planning inputs are missing, stop and produce a planning-readiness note instead of inventing the plan.
  2. Choose the planning shape.

    • Use agile backlog when iterative delivery, changing scope, or incremental value matters most.
    • Use phase-based plan when the project is small, externally fixed, or better understood as sequential stages.
    • Use hybrid plan when the project needs clear milestones but should still deliver incrementally inside each phase.
    • State why the chosen shape fits the requirements and constraints.
  3. Build the plan.

    • Carry forward the scope boundary, assumptions, and constraints from the requirements packet.
    • Break the work into major deliverables or workstreams before listing fine-grained tasks.
    • Order work using value, dependency, risk reduction, and learning value.
    • Define:
      • project scope and non-goals
      • major tasks or work packages
      • priorities
      • schedule outline, milestones, or sprint/release slices
      • responsible roles or team shape
      • technology choices or technology decision constraints
      • dependencies
      • risks and mitigations
      • partial deliveries or increments
    • When using backlog form, derive backlog items from requirements instead of freehand ideation.
    • When dates or durations are unknown, use relative sequencing rather than fake precision.
  4. Validate the plan.

    • Confirm that each major task traces back to a requirement, constraint, or risk.
    • Check that the plan is feasible for the named team and delivery model.
    • Surface blockers, unresolved technology decisions, and assumption-heavy areas.
    • Ask one focused question at a time only when a missing answer changes plan safety or sequencing materially.
  5. Capture the deliverable.

    • Default to one of these primary outputs:
      • delivery-plan
      • planning-readiness-note
    • Keep file paths repo-relative if writing into the repository.

Output Rules

  • Treat the requirements packet as the source of truth for what is being built.
  • Do not silently widen scope during planning.
  • Do not confuse a backlog with a random task list; backlog items should reflect deliverable value or requirement slices.
  • Do not present speculative dates as commitments.
  • Make ownership visible even if only role-level ownership is known.
  • Keep risks actionable: each meaningful risk should have at least one mitigation or monitoring action.
  • When the user asks only for analysis, return findings and a proposed planning shape without writing files.

Final Output

Return one of these shapes:

artifact_kind: delivery-plan | planning-readiness-note
planning_status: ready-to-plan | planned | blocked

Planning source:
- ...

Delivery approach:
- agile backlog | phase-based | hybrid

Key plan elements:
- ...

Risks / blockers:
- ...

Next step:
- ...