Executing Plans (Symfony)
Use when
- An approved implementation plan exists and must be carried out.
- The work spans several steps that must each land green.
- Resuming a plan after an interruption or a blocker.
Default workflow
- Read the whole plan, confirm the baseline tests pass, and work on a branch.
- For each step, write the test, watch it fail, implement, watch it pass, then refactor.
- Commit after each completed step, with a message that names it.
- Run the quality gates (style, static analysis, full suite) at the end of each phase.
- Track each step's status in the plan, and stop to report when reality contradicts it.
Guardrails
- Never skip watching the test fail: a test that never failed proves nothing.
- One step per commit; do not batch steps.
- Do not change the plan silently: report the deviation and the reason.
- On a blocker (failing migration, autowiring error), fix the cause, not the test.
Progressive disclosure
- Use this file for execution posture and risk controls.
- Open references when deep implementation details are needed.
Output contract
- One commit per step, tests included.
- The plan with the status of every step.
- Final validation results and any deviation from the plan.