Harness integrated planning skill. Integrates the following three legacy skills:
planning(plan-with-agent) — Turning ideas into Plans.mdplans-management— Task state management / marker updatessync-status— Verifying synchronization between Plans.md and implementation
Quick Reference
| User input | Subcommand | Behavior |
|---|---|---|
"Create a plan" / /harness-plan create |
create |
Spec delta / skip reason → Plans.md task generation |
"Add a task" / /harness-plan add |
add |
Add a new task to Plans.md |
"Mark as complete" / /harness-plan update |
update |
Change the task marker to cc:complete |
"Where are we now?" / /harness-plan sync |
sync |
Cross-check and synchronize implementation with Plans.md |
/harness-sync |
sync |
Progress check (equivalent to the independent sync surface) |
/harness-plan create |
create |
Planning with the dual sources of truth spec.md / Plans.md |
/harness-plan list |
list |
plans/manifest.json List the named Plans in |
/harness-plan switch <name> |
switch |
active plan を .claude/state/active-plan.json save to |
Default scope: all work that can proceed now (operator ruling 2026-07-24)
Plan request (create / invocation with no arguments / "plan it") is by default interpreted as "all work that can currently be started"。
- Unless the user explicitly specifies a scope, identify all open items that fall within the request context (remaining phases, unhandled follow-ups, known improvements, and all issues mentioned in the request text) and include them in the plan. Do not arbitrarily narrow it down to a minimal subset
- Even when there are many items, do not narrow them down; instead, present the full set classified into Required / Recommended / Optional / Reject. For exclusions, state the reason explicitly as Reject (do not silently drop them)
- If you judge that "do only part first" is appropriate, express it not as a narrowed-down plan but as the execution order (Phase split / Depends) within the full plan
Literal companion commands(CC 2.1.108+)
/recap: When returning after a long time, re-obtain the summary before enteringsync, then enter/undo:/rewindAn alias for . Use it as-is when you want to immediately revert the most recent plan update
Subcommand details
Standard planning quality contract
See references/planning-quality.md
harness-plan is a planning surface that produces the co-required planning output of the spec.md product contract and the Plans.md task contract.
Precedence remains spec.md > sub-spec > Plans.md as-is.
Plans.md is the task ledger, and root spec.md is the product contract, and the hierarchical relationship is not to be broken.
Do not drop the given information as-is into Plans.md.
For plan creation or large task additions, check the latest information, existing specifications, memory, and multi-perspective discussion via TeamAgent / subagents,
and convert only the elements that should be adopted into this product into a task contract.
/harness-plan create は Spec delta or Spec skip reason と Plans.md task generation together as a set.
The output must always include Spec delta or Spec skip reason .
Spec delta / Spec skip reason is generated by Harness, and the consumer only approves or revises it.
Non-trivial planning gate:
Planning that is not a one-off, minor task is handled on the premise of a TeamAgent or subagent.
Here, non-trivial refers to requests that affect multiple tasks / multiple files / multiple sessions / product behavior / API / data model / permissions / billing / external integrations / distribution surfaces / security.
If the Task tool is available, run the independent perspectives of Product / Architecture / Security / QA / Skeptic.
If it is not available, サブエージェント未使用 and state this explicitly, then evaluate the same perspectives separately on your own.
The output of non-trivial planning must always include the following verification.
team_validation_mode:not_required_lightweight/native/subagent/manual-pass/unavailablespec.md/ sub-spec /Plans.mdconsistency- Confirmation of prevention of reinventing the wheel via harness-mem / harness-recall / repo memory
- Whether it deviates from the product purpose
- Whether there are any problems with security, permissions, confidential information, or the supply chain
- Whether there is a lint / formatter baseline. If it is not set for a plan that includes source code changes, place a setup task before the implementation task
- Whether it is a plan that actually works. In other words, whether test / smoke / CI / review / release gate have been incorporated into the task DoD
For lightweight tasks, use any of team_validation_mode: not_required_lightweight is sufficient.
non-trivial planning is native / subagent / manual-pass .
unavailable must not be left as Required.
Product / Architecture / Security / QA / Skeptic are verification perspectives, not agent_type names.
Request them as perspectives from the available TeamAgent / Task subagents, and do not require spawning arbitrary agents.
The Security gate does not require actually reading confidential information.
.env or secrets must be read, stop as a Risk Gate and confirm with permitted existing guards / evidence.
Situations where it applies:
createCreate a new plan withaddAdd a task that affects product behavior / API / permissions / billing / external integrations / distribution surfaces with- The user has provided an external product, competitor, draft specification, improvement proposal, or comparison material
- There is a risk of conflict with existing specifications or past decisions
Situations where it may be treated lightly:
- For marker updates only,
update - For status verification only,
sync - typo, format, README/CHANGELOG only
- Narrow changes whose correct answer is fixed by existing spec and tests
Quality flow:
- Break down the input information and make explicit the evaluation targets, scoring axes, and uncertain facts
- Obtain the latest information. For external facts, prioritize WebSearch / official documentation / primary sources, and cross-check important points with multiple sources
- Existing specifications, root
spec.md, Plans.md, README, docs, CLAUDE.md, and related skills - harness-mem / harness-recall /
.claude/agent-memory//.claude/state/etc., check the available memory surfaces project-scoped - For non-trivial planning, use TeamAgent / Task subagents and conduct independent reviews from different perspectives such as Product / Architecture / Security / QA / Skeptic
- For plans that include source code changes, check the lint / formatter baseline, and if it is not set, have the setup task come first
- Produce a neutral scoring review and classify into Required / Recommended / Optional / Reject
$easyIn the format, report the proposal, rationale, and what will happen- Reflect only the adopted proposal into root
spec.md/ Plans.md / test task
Lane Taxonomy + Stage Gate
Fast / Gate / Release は Treat as Plans metadata, not a new skill . Do not change the 5 column template of Plans.md (Task / Content / DoD / Depends / Status), and embed lane ([lane:fast] / [lane:gate] / [lane:release]), stage (the 5 stages: verification → planning → TDD implementation → review → PR closeout), and unknown data contract (not_observed != absent, explicitly state unverifiable facts as unknown ) at the beginning of
Content or DoD. For the tag list, worked example, and DoD examples per stage, refer to
references/create.md .
create — plan creation
Hear out ideas and requirements, and generate an actionable Plans.md.
Flow:
- Check conversation context (extract from the immediately preceding discussion or conduct new interviews)
- Ask what to build (max 3 questions)
- Plan quality check(latest information, existing specifications, memory, TeamAgent / sub-agent multi-perspective review, scoring)
- Technical research (WebSearch)
- Feature list extraction
- spec.md / Plans.md dual source of truth check(Spec delta or Spec skip reason + Plans.md task)
- Priority matrix (Required / Recommended / Optional / Reject)
- TDD adoption decision (test design)
- Generate Plans.md (with
cc:TODOmarker) - Generate pre-approval section(plan-time pre-approval)
- Guide to the next action
create — pre-approval section (plan-time pre-approval)
create When finalizing the plan with pre-approval section, after producing the Plans.md task and before approval, always generate the following. The purpose is not to allow everything with a permanent allowlist, but to confirm, once at plan approval time, the "stops / asks" that are likely to occur for each work scope, by moving them forward.
Extraction targets:
- Target files, related paths, and expected change scope for each task
- Verification commands, PR closeout commands, and external API / CLI calls written in the DoD
secret-read path(.env*,secrets/**,*.pem,*.key,.ssh/**,.aws/**,credentials, etc.)- External transmission (
git push,gh pr create,gh api,curl/ API call, release / publish / deploy) - Destructive operations (
rm -rf, migration destructive step, force push, production apply)
Fixed format:
## 事前確認
- 事項: <secret-read / external-send / destructive の具体操作>
理由: <DoD または task 実行上必要な理由を 1 行>
scope: Phase <phase> / Task <task>
Output rules:
- A single line of
理由must not contain secret values. Limit it to paths / command names / target services. - At plan approval, present all items in the pre-approval section at once, and obtain approval / rejection from the user.
- Record the approval result as
.claude/state/plan-preapprovals.jsonにplan-preapproval.v2. The schema istemplates/schemas/plan-preapproval.v2.json. v1 is limited to read compatibility with existing records. - For records, maintain
事項 + 理由 1 行 + scope (phase/task). Listoperationsrequiressecret-read/external-send/destructive. Forpaths/commands/targets, list the targets. Insertdecision、approved_at、RFC3339 のexpires_at. max_usessets an upper limit including the necessary number of retries. The default is 10.usesis set to 0 at the time of new approval.- Confirmation is only once, at plan approval.
harness-work/breezingWhile running, do not issueAskUserQuestionbased solely on declared matters. - Unplanned secret-read / external transmission / destructive operations not in the record are stopped by the runtime floor / ask as before. Do not narrow the safety net.
- Approval of secret-read is not permission to display the secret value. Declare the minimal necessary path, and at work start treat it as input for per-run reflection into the project config's
runtimefloor.secretAllow.
spec.md / Plans.md dual-source-of-truth check (default)
Plans.md is the task contract for "what should be done", root spec.md is treated as the product contract for "what is correct".
co-required planning output means both outputs are required, and precedence is maintained as spec.md > sub-spec > Plans.md .
When the implementation may drift, update the root spec.md before generating Plans.md.
create と product-impacting add reads the root spec.md every time.
Preferred storage locations:
- root
spec.md - consumer repo に root
spec.mdonly when there is no existing project spec / architecture / product compass - consumer repo に root
spec.mdonly when there is nodocs/spec/00-project-spec.md - In a repo with existing conventions, a spec path that follows those conventions
Conditions requiring creation/update:
- Tasks that decide user-visible behavior, APIs, data models, permissions, billing, or external integrations
- Tasks where there are multiple implementation approaches and the choice changes product behavior
- Tasks where there are signs in past or current conversation that "the spec was ambiguous and the implementation drifted"
- Tasks where Plans.md contains the work content but the correct conditions as a project are not in a stable document
Unnecessary conditions:
- typo, format, dependency bump, README/CHANGELOG only
- Narrow refactors with no behavior change
- Fixes where the correct answer is sufficiently fixed by existing specs and tests
Output contract:
Spec delta: when updating the product contract, write the target spec path and the changesSpec skip reason: when not updating the product contract, write the reasonSpec delta/Spec skip reasonis generated by the Harness, and the consumer only approves/corrects it- even for docs-only / mechanical tasks,
Spec skip reasonin the task context / sprint contract - Do not conclude that a missing search result, unavailable memory, or unread file is absent.
not_observed != absent - Do not make the user write the spec from scratch. The agent creates the minimal delta from existing specs and input, and only presents decision branches when ambiguous
References:
docs/plans/spec-ssot.md
Session startup guidance upon create completion (required)
create When is finished, do not stop at just explaining; provide as a set:the startup command for a new session と
the first instruction prompt to enter as-is after startup .
The priority order is as follows:
- Only 1 incomplete task, or it is natural to start only the first one
- Startup command:
claude - First input:
/harness-work <task番号>
- Startup command:
- There are multiple weakly dependent tasks, and it is natural to proceed with them together
- Startup command:
claude - First input:
/breezing all - Alternative:
/harness-work all
- Startup command:
- Assumes long-running execution or re-entry
- Startup command:
ENABLE_PROMPT_CACHING_1H=1 claude - First input:
/harness-loop all - Alternative:
/breezing all
- Startup command:
Include at least the following 3 lines:
新しいセッションの起動コマンド:起動後の最初の入力:向いている場面:
Example:
新しいセッションの起動コマンド: claude
起動後の最初の入力: /breezing all
向いている場面: Phase 1 の task が複数あり、まとめて進めるほうが自然なため
If recommending a long-running setup, also include the Claude Code session startup command:
新しいセッションの起動コマンド: ENABLE_PROMPT_CACHING_1H=1 claude
起動後の最初の入力: /harness-loop all
向いている場面: 5 分を超える待機や resume をまたぐ長時間タスクのため
Notes:
scripts/claude-longrun.shis a development helper script for this repository and is not distributed to consumer environments after plugin install- Therefore, in consumer-facing guidance, always prioritize the
ENABLE_PROMPT_CACHING_1H=1 claudeone-line command - If you want to use an equivalent wrapper only during repository development,
bash scripts/claude-longrun.shmay be used on a local checkout
CI mode (--ci):
No hearing. Use the existing Plans.md as-is and only perform task breakdown.
add — Add task
Add a new task to Plans.md.
For product-impacting additions, following the "spec.md / Plans.md dual source of truth check" above, also output Spec delta or Spec skip reason .
/harness-plan add タスク名: 詳細説明 [--phase フェーズ番号]
The task is cc:TODO It is added with the marker.
update — Update marker
Change the task status marker.
/harness-plan update [タスク名|タスク番号] [WIP|完了|blocked]
Marker correspondence table:
| command | marker |
|---|---|
WIP |
cc:WIP |
完了 / done |
cc:完了 |
blocked |
blocked |
TODO |
cc:TODO |
sync — Sync progress
Compare the implementation status with Plans.md, detect and update differences (fetch current Plans.md → detect format → fetch git status → analyze agent trace → detect differences → propose marker fixes → present next actions).
cc:完了 If there is at least 1 task, run a retrospective by default ON that analyzes estimation accuracy, blocking causes, and scope changes (sync --no-retro to skip).
For the complete version of Step 0-6 and the procedure for recording to harness-mem, see references/sync.md .
team mode / issue bridge
Keep Plans.md as the source of truth, and use GitHub Issue integration only in opt-in team mode.
- Do not use bridge in solo development
- In team mode, create one tracking issue, and under it generate per-task sub-issue payloads in dry-run
scripts/plans-issue-bridge.shdoes not actually update GitHub and always returns dry-run payloads- Changes to Plans.md are not made by this bridge
Reference:
docs/plans/team-mode.md
named Plans
When using multiple Plans.md files, use plans/manifest.json as the source of truth and select by name (in 1 run, use only 1 named plan. For long-running / CI / issue bridge, do not rely on the active pointer; pass --plan <name> . The manifest path is project root relative only).
scripts/plan-registry.sh list
scripts/plan-registry.sh switch roadmap
scripts/plans-issue-bridge.sh --plan roadmap --format markdown
node scripts/generate-sprint-contract.js --plan roadmap 9.1.1
Reference: docs/plans/named-plans.md
Plans.md format conventions
Format
A 5-column (Task / Content / DoD / Depends / Status) Markdown table. DoD must be a verifiable one-liner that can be judged Yes/No ("feels good" and "works properly" are prohibited).
Depends is one of -(no dependency) / task number / comma-separated multiple / phase dependency. For the full generated template (including the Purpose line), see
references/create.md .
Grading design for DoD / acceptance_criteria
DoD や acceptance_criteria When writing, judge by whether "a part-time worker can mark ○× on the checklist."
The discipline of translating into 3 layers: the mechanical ○× floor (tests, character count, exit code) / LLM perspective grading (structure, appeal checklist) / essential doc reference (the relevant clauses of spec.md and decisions.md),
and the translation procedure when ambiguous adjectives (good/proper/easy to understand, etc.) are detected are
references/criteria-design.md refer to.
TDD tags
In Plans.md tasks, a tag explicitly indicating the TDD judgment can be written in the content or the DoD.
| tag | Meaning | tdd_required Inference |
|---|---|---|
[tdd:required] |
This task needs a failing test written first | true |
[tdd:skip:<reason>] |
This task omits TDD with a reason | false, skip_tdd_reason=<reason> |
<reason> is not left empty.
Example: [tdd:skip:docs-only]、[tdd:skip:no-test-framework-detected]。
When there is no tag, tdd_required is inferred in the following order.
- Plans.md tag:
[tdd:required]/[tdd:skip:<reason>] - files:
src/,app/,cmd/,lib/,pkg/,internal/,go/etc., required if it includes source implementation - TDD inference: if docs-only or no test framework, not required with a skip reason
optional briefs / manifest
harness-plan create attaches a brief only when necessary.
- The project spec SSOT is a document that fixes the correct conditions for the entire project, and is created only when necessary
- For tasks that include UI,
design brief - For tasks that include API,
contract brief - The brief is supplementary material that briefly fixes "what to build," and does not replace Plans.md or the spec SSOT
- The list of skill frontmatter is
scripts/generate-skill-manifest.shcan be made into machine-readable JSON with
Reference:
docs/plans/briefs-manifest.mddocs/plans/spec-ssot.md
Marker list
| marker | Meaning |
|---|---|
pm:依頼中 |
Requested by PM |
cc:TODO |
Not started |
cc:WIP |
In progress |
cc:完了 |
Worker work complete |
pm:確認済 |
PM review complete |
blocked |
Blocked (reason must always be stated) |
Post-plan-finalization path (non-engineer-oriented plan overview)
Once the task append to Plans.md is complete, so that the non-engineer requester can judge the plan,
harness-plan-brief is proposed. This is a "plan overview" screen that summarizes understanding, options, risks, and acceptance criteria on a single HTML page, and can be read without specialized knowledge. It is used for consensus building before entering implementation.
Related skills