Quick Ref: Turn an intent into beads that each carry a runnable acceptance test defining "done". The generative discipline behind the bdd-foundry workflow — extracted here so behavior-first planning survives independent of any orchestrator. Output: frozen Gherkin → executed-red tests → derived spec → an acceptance-gated bead DAG.

YOU MUST EXECUTE THIS DISCIPLINE. Do not just describe it.

Contract ownership (single owner, age-skills-audit-fable-l6ic.8). This skill owns the intent → Gherkin → EXECUTED-red → acceptance-gated bead-DAG contract. /discovery, /plan (its Gherkin Scenarios Contract), and the bdd-foundry workflow cite this skill rather than restating the discipline.

Constraints

  • Do not create tracker beads before the manifest passes coverage, cycle, runnable-test, and independent-review gates because an unvalidated DAG pollutes the shared work surface.
  • Do not accept prose-only or harness-error "tests" as red; each acceptance command must resolve to one real unignored test and fail for the intended missing behavior.
  • Keep one frozen scenario per slice because combining behaviors hides partial completion and defeats the vertical acceptance boundary.

Why this exists — the 3/10 problem

Spec-first planning ships beads with no done-criteria: a title, a paragraph of "why", and nothing a machine can run to decide it is finished. The implementer then invents the bar, and "done" becomes a self-grade. Behavior-first planning inverts the order: define the behavior as an executable test before the design, so every bead is born with a runnable contract. The rule is absolute — no runnable acceptance test, no bead.

This is the successor to plain decomposition (plan): same DAG output, but each unit carries a failing test that has actually been run red, not prose. It is the planning-side mirror of the membrane (docs/architecture/control-loop-model.md): the bead's gate is deterministic ground truth, not an opinion.

The four phases (run in order)

Phase 1 — Behaviors: define DONE first

Turn the intent into concrete, testable Gherkin scenarios — Given/When/Then — covering the happy path, edge cases, AND error/failure paths. Every clause must be specific enough to become a runnable test; "works correctly" is rejected.

  • Cover the failure paths explicitly: unparseable input, missing dependency, partial/timeout response → the behavior must say abort/block, never silent-pass.
  • If a fresh-context or cross-family adversary is available, have it list the missing scenarios (security/correctness bypasses a green test would miss) and disposition every gap: folded / rejected (one-line reason) / deferred (say where it goes).
  • Write the result to behaviors.md as the frozen definition of done. Freezing means: downstream phases derive from it; they do not silently add or drop scenarios.

The standing adversarial dimension checklist

The adversary applies this concrete checklist to every behavior that touches an input, a trust boundary, a mutation/write surface, a failure path, or external state — and emits the missing attack-vector scenario for each applicable class. These are the bypass classes a green test most often misses (cheap to add here, expensive at the gate):

  • FAIL-CLOSED on EVERY failure path — unparseable input, missing/absent dependency, substrate/IO error, partial/malformed/timeout response → ABORT/BLOCK, never silent-pass or silent-skip-and-continue.
  • NO FORGEABLE TRUST MARKER — never trust a caller-settable signal (env var, flag, header, marker file) as proof a check ran; re-derive/verify provenance.
  • NO RAW UNTRUSTED STRING past a boundary — canonicalize/encode before display, argv, or serialization (values with quote, backslash, newline, shell metachar, unicode/case).
  • ENFORCE AT THE SINK, not the source — last-wins / passthrough-after--- / override vectors; the component that ACTS must be the one that validates.
  • NO OVERCLAIMING TEST — a property proven only under harness conditions (injected PATH/env, scratch stub) is not a live/production proof; the production path needs its own scenario.
  • INPUT-CHANNEL variants of every surface — stdin vs argv, heredoc, file vs inline, symlink/case/unicode path aliases, TOCTOU lookup-to-write race, nesting/depth.

Also read any repo-local gate-findings ledger (try docs/gate/findings-ledger.md) and apply its Standing Review Dimensions — those are real defects a gate already caught; do not let them recur. This is the ratchet: every gate finding permanently upgrades this checklist.

Phase 2 — Acceptance tests: Gherkin → EXECUTED red

Turn each frozen scenario into a runnable test in the project's framework. The test IS the executable definition of done. The tests must be currently failing (red) because the feature is not built yet — and you must observe the red, not assert it:

  • Write the tests under acceptance-tests/ and an acceptance-tests.md index mapping scenario id → test name/path, including the one-line command that runs the whole suite.
  • RUN the suite and report the mechanical result (red count, green count, harness-errored count). A test that already passes asserts nothing new; a test that crashes on a syntax/harness error is not a valid red. Both are defects to flag before proceeding.
  • One invocation per test — never pass multiple positional test-name filters to a single cargo/pytest/go test call (it arg-errors before any test runs); chain with &&.

This phase is the heart of the discipline. Skipping the executed red is how a plan silently regresses to spec-first.

Phase 3 — Spec: derived to make the tests pass

Design the architecture/spec whose only job is to make the acceptance tests pass — derived from the behaviors + tests, not free-form. For each behavior, name the components/changes that satisfy it. A repaired or already-green test from Phase 2 gets its assertion fixed here. Keep it tight: a spec, not a monument. Write to spec.md.

Phase 4 — Acceptance-gated bead DAG

Decompose the spec into a dependency-ordered DAG of beads. Every bead MUST carry:

  • a scenario_ref — the id of a real frozen scenario it delivers, and
  • an acceptance_test — an invocable command + test path (from acceptance-tests/ or the project test tree) that defines done for that bead. Prose-only acceptance is rejected.

Then apply the mechanical gate (compute it, do not self-report):

  1. Runnable — each acceptance_test resolves (in list mode: --list / --collect-only / -list / --count) to exactly one unignored test. Not zero, not 2+, not an arg error.
  2. Valid ref — every scenario_ref is a real frozen scenario id.
  3. Coverage — every frozen scenario is covered by ≥1 bead (report holes).
  4. Cycle-free — the dep graph topologically sorts.

A bead failing any check is rejected, not written. Only the gate-passed set advances.

Batch size — one behavior per slice (mechanical). A slice bead delivers exactly one behavior = one Gherkin scenario; a slice carrying two or more is a batch, not a slice, and must be split. Enforce it mechanically, don't eyeball it: bash scripts/check-slice-batch-size.sh <bead-id> reads the bead body and FAILs on >1 scenario (naming the count and the scenarios to split), PASSes on exactly one, and WARNs on zero (advisory — a scenario-less task bead is not hard-blocked while this discipline is new). Run it at plan time before a slice becomes a bead, and again at crank time on any slice that grew — surfaced extra behavior becomes a follow-up bead, never absorbed into the current slice.

The closing gate — validate BEFORE the tracker write

Behavior-first planning is not done when the beads are drafted — it is done when an independent reviewer confirms them. Before writing anything to the tracker:

  • Produce a manifest of the proposed (not-yet-tracked) bead set.
  • Have an independent, fresh-context reviewer (cross-family where possible — the author never grades their own plan) score crank-readiness against the frozen behaviors and spot-run ≥2 acceptance commands.
  • Write to the tracker only on a clearing verdict AND coverage-complete AND cycle-free AND the mechanical drift-guard green. Otherwise repair the manifest and re-validate; do not pollute the tracker with un-cleared beads.

Use br from the main checkout (never a worktree — it forks the bead DB), each bead self-contained with an explicit ACCEPTANCE section, deps wired per the manifest, overlap-checked against existing open beads.

Relationship to the bdd-foundry workflow

bdd-foundry (.claude/workflows/bdd-foundry.js) is the thin orchestrator over this discipline: it dispatches each phase as a black-box agent, gates on the mechanical (computed-in-JS) checks above, and writes to the tracker only on the cleared verdict. This skill is the discipline; the workflow is the deterministic harness that runs it conformantly (see docs/architecture/workflow-conformance-pattern.md). When invoked directly (no workflow), you run the four phases yourself and apply the same gates by hand.

The skill dogfoods its own rule: its behavior is pinned by an executable spec, references/behavior-first-planning.feature — the same Gherkin → runnable-acceptance shape it asks every plan to produce.

Do NOT

  • Duplicate the lighter single-BDD-intent shape phase of the operating-loop — this is the full Gherkin → executed-red → acceptance-gated-DAG discipline, used when beads must be genuinely crank-ready.
  • Write a bead whose acceptance is prose, "see spec", or an unrun test.
  • Grade your own plan — the closing gate requires an independent reviewer.

Output Specification

  • Path: write behaviors.md, acceptance-tests/, acceptance-tests.md, and spec.md in the planning workspace; tracker mutations happen only after the closing gate.
  • Filename: the proposed bead-set manifest is bead-manifest.json; acceptance test files follow the target repository's native test filename convention.
  • Format: behaviors.md is frozen Gherkin, acceptance-tests.md maps scenario IDs to commands and paths, and bead-manifest.json is JSON with bead IDs, scenario_ref, acceptance_test, and dependency arrays.
  • Exit code: validate with the project test collector/list command, bash scripts/check-slice-batch-size.sh <bead-id>, a cycle check, and the independent closing verdict; any nonzero check blocks tracker writes.
  • Downstream handoff: consumed by $plan, $implement, or $crank only after the manifest is coverage-complete, cycle-free, independently cleared, and its executed-red evidence is attached.

Quality Checklist

  • Every frozen scenario has happy, edge, and applicable failure-path coverage and maps to at least one bead.
  • Every bead maps to exactly one scenario and carries an invocable acceptance test that was observed red for the intended reason.