Plan a GitHub issue snapshot into docs/<ISSUE_SLUG>-tasks.md. This is the
Phase 2 orchestrator for the GitHub planning workflow: it routes stages,
dispatches specialists, preserves stage artifacts for resume and critique, and
returns a concise handoff.
The orchestrator keeps only workflow state, subagent verdicts, paths, counts, and user decisions in context. Detailed contracts, templates, validation checks, and source-backed background are loaded just in time from bundled references or optional external URLs.
Inputs
| Input | Required | Example |
|---|---|---|
ISSUE_SLUG |
Yes | acme-app-42 |
RE_PLAN |
No | true |
DECISIONS |
No | SSO decision changes task dependencies |
Phase 2 is file-driven. docs/<ISSUE_SLUG>.md must already exist as the GitHub
issue snapshot.
Progressive Loading Map
| Need | Load |
|---|---|
| Normal run, dispatch payloads, retry loop | ./references/execution-guide.md |
| Final artifact contract, branch policy, child-issue handling | ./references/output-contract.md |
| Critique-driven re-plan or recovery from stage artifacts | ./references/re-plan-cycle.md |
| Source-backed background or current platform syntax | ./references/external-sources.md |
| Subagent-specific guides, templates, or validation checks | Load only from the dispatched subagent |
Bundled paths in this file are relative to this SKILL.md; files loaded later
use paths relative to their own locations. All bundled files travel with the
package.
External URLs are optional progressive enhancement: fetch them only when local
contracts need background or current syntax, and proceed from bundled references
when network access is unavailable.
Subagent Registry
| Subagent | Path | Purpose |
|---|---|---|
task-planner |
./subagents/task-planner.md |
Decompose the issue and draft the stage 1 plan |
dependency-prioritizer |
./subagents/dependency-prioritizer.md |
Add dependency order, priority, and branch names |
task-validator |
./subagents/task-validator.md |
Validate the prioritized plan and append QA findings |
stage-validator |
./subagents/stage-validator.md |
Check preflight, inter-stage, and final structural gates |
Workflow
| Path | When | Next reference |
|---|---|---|
| Normal | RE_PLAN is absent or false |
./references/execution-guide.md |
| Re-plan | RE_PLAN=true with critique decisions |
./references/re-plan-cycle.md, then ./references/execution-guide.md |
The normal path is: preflight snapshot validation, Stage 1 detailed planning, Stage 1 validation, Stage 2 dependency/branch planning, Stage 2 validation, Stage 3 final validation report, Stage 3 validation, postpipeline validation, handoff.
Preserve docs/<ISSUE_SLUG>-stage-1-detailed.md,
docs/<ISSUE_SLUG>-stage-2-prioritized.md, and
docs/<ISSUE_SLUG>-tasks.md on disk. They are orchestration state for resume,
critique, and targeted retries; they are not implementation outputs.
Use targeted fix loops only. Re-dispatch the stage that produced the failing artifact, pass only the validator's issue list, rerun only the failing gate, and stop after 3 failed cycles for the same gate.
Return Format
Return only this phase handoff. Use PLANNING: PASS only when every stage and
stage-validation gate has passed.
PLANNING: PASS | FAIL
ISSUE_SLUG: <ISSUE_SLUG>
File: <final file path or "not written">
Tasks: <N>
Branches: <N unique branch names>
Cross-cutting questions: <N>
Validation warnings: <N>
Failure category: PREFLIGHT | STAGE_1 | STAGE_2 | STAGE_3 | POSTPIPELINE | NONE
Reason: <one line>
Artifacts preserved: <comma-separated paths>
Example
- Load
./references/execution-guide.mdfor the dispatch payloads. - Dispatch
stage-validatorforpreflight; it returnsSTAGE_VALIDATION: PASS. - Dispatch
task-planner,dependency-prioritizer, andtask-validatorin sequence, validating after each produced artifact. - Dispatch
stage-validatorforpostpipeline; it returnsSTAGE_VALIDATION: PASS. - Return the concise