Arc Implementation Plan Progress

Create two synchronized in-flight artifacts under the project docs/ directory:

  • docs/<ID>-IMPLEMENTATION_PLAN.md or a clearly named variant
  • docs/<ID>-progress.txt with checkbox execution tracking mapped to the plan phases

The leading word is synchronized: every progress item must trace to the plan, and every plan phase must have progress coverage.

File naming & lifecycle

  • Unique prefix. Prefix both artifacts with a unique work-item identifier so concurrent plans never collide in docs/ — use the tracked work-item ID when one exists (e.g. docs/W-000025-IMPLEMENTATION_PLAN.md, docs/W-000025-progress.txt), otherwise a short kebab-case feature slug (e.g. docs/rate-limit-IMPLEMENTATION_PLAN.md). The plan and its progress file MUST share the same prefix.
  • Archive on completion. When the work is complete (all progress items [x] / the shipping PR merges), move both files into docs/archive/ so docs/ only ever shows in-flight plans. Use scripts/archive_plan.sh <plan-file> <progress-file>, or git mv them manually. Record this move as the final progress step.

For the required output shape, load references/output-contract.md. For default stack assumptions, load STACK_DEFAULTS.md only when the user has not specified a stack.

Steps

  1. Gather repository and request context.

    • Read existing README*, planning docs, docs/*-progress.txt, and relevant source structure.
    • Identify user-provided specs/ideas and whether they are available locally.
    • Prefer explicit unknown notes over invented details.

    Completion criterion: the baseline section can cite concrete repo evidence or explicitly mark unavailable facts as unknown.

  2. Choose plan mode.

    • Greenfield mode: no meaningful implementation exists; plan from zero.
    • Gap mode: implementation exists; compare current baseline to target scope and plan missing work.

    Completion criterion: the plan states its mode and why that mode fits the observed repo state.

  3. Write the implementation plan.

    • Follow the contract in references/output-contract.md.
    • Include objective, scope boundaries, baseline, milestones, deliverables, dependencies, risks, acceptance criteria, deferred/out-of-scope work, and immediate next steps.
    • Include concrete test tasks aligned to user-focused behavior, not implementation-detail coupling.

    Completion criterion: every milestone has deliverables, dependencies/risks where relevant, and acceptance criteria that another agent can verify.

  4. Create or update the docs/<ID>-progress.txt tracker.

    • Ensure docs/ exists, then run or follow scripts/init_progress_txt.sh <plan-file> [progress-file] when useful; pass explicit docs/<ID>-IMPLEMENTATION_PLAN.md and docs/<ID>-progress.txt paths.
    • Preserve completed [x] items when updating an existing tracker.
    • Use stable numeric IDs (1.0, 1.1, 2.0) and ASCII checkboxes.
    • Make the final checkbox the archival step (move plan + progress to docs/archive/).

    Completion criterion: every plan phase has a phase-level checkbox and concrete sub-step checkboxes; completed prior work remains completed.

  5. Validate synchronization.

    • Check that each progress item maps to a plan phase.
    • Check that each plan phase appears in the progress file.
    • Confirm the plan and progress files share the same unique <ID>- prefix.
    • Replace vague tasks such as "improve app" with concrete deliverables.

    Completion criterion: the final response names both artifact paths and confirms plan/progress synchronization or lists the exact unresolved mismatch.

  6. Archive on completion.

    • When every progress item is [x] (or the shipping PR merges), move both artifacts into docs/archive/ via scripts/archive_plan.sh <plan-file> <progress-file> or git mv.
    • This keeps docs/ scoped to in-flight plans only.

    Completion criterion: on completion both files live under docs/archive/, or the response states the work is still in flight and the files remain in docs/.

Boundaries

  • Use arc-creating-user-stories when the user wants a GitHub Issues user-story backlog.
  • Use arc-planning-work when the user asks to plan implementation of an existing tracked work item (it publishes to the source destination and also creates synchronized docs/<ID>-IMPLEMENTATION_PLAN.md and docs/<ID>-progress.txt artifacts). Use this skill directly for standalone plan/progress creation or updates without a tracked work-item source.