Tracing Requirements To Verification

Overview

Use Requirements-to-Verification Traceability Framework (RVTF) to keep delivery work anchored from intent to evidence and delivery decision. Requirement Trace proves each criterion; Journey Trace, when applicable, proves that an actor can traverse the required path and reach the expected outcome. Completion means every required Requirement, canonical Acceptance Item, applicable Journey, review finding, and meaningful gap has an explicit evidence-backed decision.

When review can block closure or expand scope, use bounded review governance to make applicability, coverage, remediation scope, and reopen decisions explicit. Review governance controls review intake; it never replaces requirement truth or the final Completion Gate.

Core Rule

Never let "implemented" mean only "code exists" or "tests pass." Each Requirement must trace through canonical Acceptance Items to implementation work, item evidence, and gap decisions. When acceptance depends on ordered or causally connected observable steps, also require a Journey Trace with path and outcome evidence.

No review finding becomes implementation work until it is classified and linked
to a requirement decision.

If a finding cannot be linked to an existing requirement, accepted amendment, or existing cross-cutting constraint, it is not automatic scope. Record the decision before doing the work.

Usage Modes

Choose the lightest mode that controls delivery risk:

Mode Use when Minimum artifact
discovery Exploring or prototyping without a completion claim. Assumptions, candidate requirements and Journeys, known unknowns.
lite Small bounded change with low risk. Requirement and Acceptance Item IDs, evidence notes, gap decisions, plus a Journey applicability decision when a path trigger exists.
standard Multi-step delivery, phase work, review, or handoff. Requirement Trace, explicit Journey applicability, Journey Trace when required, review applicability, gap ledger, closure packet.
strict Security, privacy, migrations, compatibility, money, production risk, or cross-agent execution. Standard artifacts plus bounded review governance, independent review evidence, evidence quality, and scope amendment records.

Do not lower the mode to justify unsupported completion. If review discovers safety, privacy, compliance, data-loss, compatibility, or regression risk, move at least that concern through strict handling.

Workflow

  1. Select a usage mode.
  2. Build a capability tree for the requested scope.
  3. Assign stable requirement IDs to every required behavior, constraint, migration, compatibility promise, documentation change, and non-functional requirement.
  4. Mark cross-cutting constraints explicitly when they apply across multiple capabilities.
  5. Convert each acceptance criterion into one canonical Acceptance Item nested under exactly one Requirement. Give it a stable delivery-scope ID, source provenance, verification method, status, item evidence, and gap references.
  6. Decide Journey applicability. Build a Journey Trace when an actor must traverse ordered or causally connected observable steps to reach an acceptance outcome; otherwise record a justified not_required decision when the mode requires it.
  7. When Journey Trace applies, define actor, goal, expected outcome, ordered Journey Steps, Acceptance Item references, path evidence, status, and gap references.
  8. Map host implementation tasks, stories, phases, or increments to the Requirement, Acceptance Item, Journey, and Journey Step IDs they cover.
  9. Decide whether review governance applies. If it does, record a review contract, epoch, batches, freeze, remediation cycles, closure, and controlled reopens as needed.
  10. During execution and review, classify every gap or finding before turning it into work.
  11. Update Acceptance Item, Requirement, and Journey status from target-specific evidence quality, not from worker reports or parent-task completion.
  12. Before completion, produce a closure packet listing Requirement, Acceptance Item, and Journey dispositions; accepted amendments; review closure; residual risk; gaps; and next-phase entry conditions.

Artifact Chain

Use this chain for every non-trivial delivery unit:

Capability tree
  -> requirement IDs
    -> canonical acceptance items
      -> verification methods
        -> journey applicability and Journey Trace when required
          -> host implementation tasks
            -> item evidence and path evidence
              -> review governance artifacts when applicable
                -> review findings
                  -> gap ledger
                    -> closure decision

Read references/schema.md when creating or reviewing concrete RVTF artifacts. Read references/gates.md when running design, plan, implementation, review, or completion gates. Read references/review-governance.md when review applicability, review contracts, batches, freeze, remediation review, late findings, or reopen decisions matter. Read references/pressure-scenarios.md when creating or updating this skill, or when forward-testing whether an agent actually follows RVTF. When a user explicitly asks to inspect a trace visually, read references/visualization.md for the optional local-view workflow. Do not start it merely because a trace exists or ordinary progress can be explained in conversation.

Operational Economy Plane

Use the Operational Economy Plane to organize delivery scope, shared proof, validity, verification and review cadence, and continuation. It may reduce duplicate execution, but it never changes Requirement, Acceptance Item, Journey, review, gap, or closure truth. Host-native lifecycle authority also remains intact.

Apply this rule at every lifecycle boundary:

effective gates = host-native mandatory gates ∪ RVTF-required gates

The stronger freshness, full-suite, or reviewer requirement wins, including specialist and independence constraints. Economy policy cannot waive a mandatory host or RVTF gate. Read references/schema.md, references/gates.md, and references/review-governance.md for the detailed fields and gate algorithms.

Delivery Scopes And Groups

Use goal, milestone, and unit as containment-based delivery closure scopes. Keep execution_batch, verification_batch, and review_batch as orthogonal groups; a group organizes work but never becomes a closure parent or proves a member complete.

For every parent with required children, aggregate only from the authoritative, versioned required_child_inventory_revision and required_child_scope_refs. Each child records required_for_parent and its RVTF disposition; keep host lifecycle values such as done|archived|shipped|override separately in host_status.

  • A required blocked or incomplete child cannot support parent completion.
  • Only child dispositions complete, complete_with_deferred_gaps, complete_with_residual_risk, or a recorded accepted scope amendment that explicitly removes that child followed by a new authoritative required_child_inventory_revision may participate in parent closure. Owner acceptance without the amendment is insufficient.
  • Propagate child deferred-gap or residual-risk truth to the corresponding parent disposition; never aggregate it silently to plain complete.
  • Closing a Unit never implies that its Milestone or Goal is complete.

Goal Continuation Contract

For a new Operational Economy closure packet declaring schema_version: "0.4.0" whose current scope ends below a known parent, record a Goal Continuation Contract with parent_scope_ref, parent_disposition, continuation_mode (durable_host|artifact_only|advisory), authority_ref, resume_locator, remaining_scope_refs, next entry conditions, and the actual execution_action (continue|stop|await_owner|host_boundary). Record stop_basis only when the current execution actually ends through stop or an explicit host_boundary; omit it for actions that do not stop at that point. Legacy schema_version: "0.3.0" closure packets remain valid without a continuation record.

Apply mode-specific authority and locator rules: durable_host requires a resolvable authority_ref and resume_locator; artifact_only locates the durable continuation artifact and names its responsible authority without claiming a scheduler; advisory names the controlling user or orchestrator and uses an explicit unknown locator when none exists. New schema_version: "0.4.0" detached or lite work with an unknown parent must still record advisory continuation with parent_scope_ref: unknown and parent_disposition: unknown; it must not invent parent closure. RVTF records continuation and ownership; it never schedules or invokes the next host workflow, bypasses a host boundary, or overrides user or orchestrator authority.

If an iteration changes no implementation, Evidence Claim, review finding, gap, or disposition, emit a non-blocking operational-economy warning. Select a new unblocked scope, record why repetition can produce new evidence, or record the blocker with owner and entry condition; do not auto-launch another iteration or infer completion from elapsed time or iteration count.

Evidence Artifacts, Claims, And Validity

Separate the reusable Evidence Artifact from each target-specific Evidence Claim. One artifact may support many claims, but every claim names its target, states proves, records coverage when applicable, and has independent validity. An artifact failure invalidates its dependent claims unless the receipt explicitly partitions and preserves unaffected claims. An Item claim never implies a Journey path claim. Supported legacy inline evidence remains valid only when it carries the same target-specific artifact and claim semantics; do not require a destructive representation migration.

Use valid|stale|invalidated|unknown for evidence_claims[].validity.status; these are not trace object statuses. For cross-revision reuse in standard or strict, record an auditable assessment containing the claim, from/to revision, policy, assessor, target/verifier/dependency/environment/freshness comparison basis, rationale, and decision. Opaque fingerprints alone are insufficient. A lite manual rationale must identify what was compared for the target criterion or outcome, verifier, relevant dependency inputs, environment, and freshness. If any material aspect cannot be assessed, set evidence_claims[].validity.status: unknown and run the targeted gate.

A Git revision change triggers assessment, not global invalidation. Invalidate or downgrade only affected claims and the trace objects that depend on them; preserve independent Item, Requirement, and Journey truth.

Keep these three records distinct:

  • evidence_claims[].validity.status: whether target-specific proof remains reusable;
  • host_gate_status: whether the effective current-boundary gate ran and met its contract;
  • current_test_status_claim: what may truthfully be said about current tests.

A reusable valid claim never justifies saying current tests pass when the host freshness contract requires a new run.

Verification Economy

Select verification by tier while still enforcing effective gates:

Tier Purpose
worker Check the changed target during implementation.
batch Check affected shared surfaces before grouped integration or handoff.
milestone Run the integration gates required at Milestone closure.
completion Audit all required dispositions, evidence validity, reviews, gaps, gates, and continuation for the scope being closed.

The completion tier is a complete semantic audit, not an unconditional command to run every test suite. Run a fresh or full suite when host-native or RVTF policy requires it, and never weaken mandatory fresh/full-suite/review gates. When a required tier fails, keep that failure visible, isolate and rerun the minimal failed target, then escalate back to the required tier. Do not loop a flaky suite until it happens to turn green; record flakiness, quarantine policy, or a blocker and follow the required escalation path.

Review Economy

Treat required review dimensions as normative coverage. Reviewer and batch count are host execution choices, not a count derived from dimensions. Preserve implementer-independent review for strict; strict independence alone does not force separate batches. Allow a host-permitted independent combined batch when its expertise and dimension coverage are sufficient. Require separate batches only when specialist expertise or segregation of duties cannot be satisfied by the combined batch, or when host-native fan-out mandates them.

Every applicable review contract declares these auditable inputs: review cadence (unit|batch|milestone|host_native), child_scope_policy, covered_child_scope_refs when the policy is covered_at_parent, batch_combination_policy, and host_native_required_batches. The Completion Gate compares those declared inputs with actual parent coverage, batches, and receipts; declarations alone are not review evidence.

With child policy covered_at_parent, record review_state: pending_at_parent before the parent review; never record future review as existing evidence. A Unit whose closure contract requires formal review remains incomplete until an actual receipt covers it. Preserve every historical batch and its subject revision immutably. Cross-revision reuse requires review_coverage_carry_forward with source batch, from/to revisions, unchanged dimensions, impact assessment, assessor, and decision; otherwise run a delta batch or controlled reopen.

Status Taxonomy

Use these statuses consistently for Requirements, Acceptance Items, and Journeys. Journey Steps do not have an independent formal status:

Status Meaning
pending The object exists but implementation has not started.
implemented Code or docs exist, but verification evidence is not complete.
verified Required evidence exists and was checked.
deferred Deliberately postponed with reason, owner, and follow-up trigger.
blocked Cannot proceed without external input or state change.
rejected Explicitly out of scope or no longer required.

Do not invent additional statuses such as partially verified. Partial proof stays implemented; record missing coverage as evidence gaps.

Review Finding Intake

Classify every review finding before implementation:

Class Decision rule
required-gap Existing requirement or acceptance criterion is missing or partial. Fix now unless explicitly deferred or blocked.
evidence-gap Implementation may exist but evidence does not prove the acceptance criterion. Keep status implemented; add evidence or record a gap.
cross-cutting-constraint Safety, privacy, security, compatibility, data integrity, performance, observability, or regression concern. Do not reject only because the original spec omitted it.
scope-amendment Legitimate new requirement not in the original scope. Add an amendment decision before implementation.
optional-enhancement Useful but not required. Reject or defer unless an owner accepts it into scope.
quality-defect Code quality issue that threatens an existing requirement or maintainability standard. Link it to that constraint or record it as non-blocking review debt.

For governed review, also record the finding's epoch, batch, dimension, subject revision, and whether it was discovered after freeze. Late findings can reopen only through trace impact and owner decision, not severity labels alone.

Bounded Review Governance

Use bounded review governance when formal reviewers, multiple review passes, blocking findings, strict risk, or prior remediation review are part of the delivery decision.

The governance flow is:

Delivery Scope
  -> Review Applicability
    -> Review Contract
      -> Review Epoch
        -> Review Batches
          -> Finding Freeze
            -> Remediation Cycle(s)
              -> Review Closure or Controlled Reopen

Baseline dimensions are requirement-fidelity, impact-and-ownership, and verification-and-closure. Triggered dimensions cover state/compatibility, concurrency/recovery, trust/security/privacy, performance/resources, and operations/observability.

Freeze only after every expected batch covers its assigned dimensions on the same subject revision and every finding has RVTF classification plus required owner decisions. Freeze bounds remediation scope; it is not delivery completion.

Closure review checks frozen findings, changed evidence, and direct remediation risk. Reopen only for required_gap, evidence_invalidated, remediation_regression, cross_cutting_risk, or accepted_scope_amendment, with affected requirements, dimensions, owner decision, and next epoch recorded.

When a terminal review verdict has already assessed a stable material subject, distinguish that verdict from the update that records it. A receipt-only finalization may attach the verdict and derive only its explicitly authorized finding, gap, review, and closure transitions. When a host-aware diff assessment confirms that no material delivery truth changed, that terminal update does not create a new review obligation. Any ambiguous change, or any change to requirements, acceptance, Journeys, evidence truth, review scope, risk, host gates, implementation, packages, or release facts, is material and returns to impact assessment plus delta review or controlled reopen. A self-declared receipt-only label is never proof.

Requirement Validity

Check whether requirements are still valid when new information appears. Invalid, obsolete, contradictory, or infeasible requirements need a source, owner, rationale, and decision: amend, reject, defer, or block. RVTF tracks delivery fidelity; it does not prove the original requirement was correct.

Canonical Acceptance Items

An Acceptance Item is an independently verifiable criterion nested under requirements[].acceptance[]. It is the canonical criterion record, not a copy made for a task or Journey.

  • Each Acceptance Item belongs to exactly one Requirement and has a globally unique, stable ID within the delivery scope.
  • Keep source provenance separate from identity. A moved bullet does not get a new ID merely because its locator changed.
  • Record criterion, source reference, verification method, status, target-specific item evidence, and gap references on the Item.
  • Journeys and Journey Steps reference Acceptance Item IDs. Never copy Item criterion, status, or evidence into a Journey.
  • One Acceptance Item may support multiple Journeys; update its status once on the canonical Item.

Requirement status must obey the child Items:

Active required Acceptance Item state Parent Requirement constraint
Any pending or implemented Item Requirement cannot be verified.
Any deferred Item Requirement is deferred unless an accepted scope decision removes the Item from the required set.
Any blocked Item Requirement is blocked.
Any rejected Item Exclude it only with a recorded validity or scope decision.
All Items verified Requirement may be verified only if Requirement-level constraints and evidence gaps are also closed.

Do not derive percentages or a partial status. Preserve progress on the child Items while applying the parent constraint.

Journey Applicability And Trace

Build a Journey Trace when acceptance depends on an actor reaching an outcome through ordered or causally connected observable steps. The actor may be a user, operator, developer, API consumer, external system, service, or automation. Applicability depends on the path, not on labels such as UI, CLI, API, migration, or infrastructure.

Common triggers are:

  • item evidence alone cannot prove the overall outcome;
  • steps have order, state-transition, or causal dependencies;
  • the path crosses Requirements, components, systems, or responsibility boundaries;
  • failure, recovery, rollback, or an alternative path affects acceptance;
  • end-to-end closure must be judged backward from an actor goal.

In discovery, record candidate Journeys only. In lite, make an applicability decision when a trigger exists. In standard and strict, record journey_applicability.decision as required or not_required with rationale. Strict risk alone does not make a Journey required. When exact item-level verification fully proves an isolated change and no ordered or causal path exists, record not_required; do not create a synthetic Journey.

An Actor Journey records a stable ID, name, actor, goal, expected outcome, ordered Journey Steps, path evidence, status, and gaps. Each required Journey Step describes an actor-observable behavior or result and references at least one canonical Acceptance Item ID. A source-code edit is an implementation task, not a Journey Step. Scenario remains a way to describe preconditions or alternate/failure/recovery context; it is not a separate v1 trace object.

When a Journey decision Step requires an actor to judge, choose, confirm, or authorize, its referenced Acceptance Items must define the actor-observable decision basis needed to act from the public surface. Keep that basis separate from exact machine binding: a stable selection token may bind the choice, but an opaque ID, array position, internal lookup, or fixture-only fact cannot by itself prove that a human actor could make the decision. Include material differences, relevant constraints or unknowns, result confirmation or revalidation, and a safe hold or evidence-seeking path when the declared decision cannot yet be made. The adopting domain decides which concrete facts are material.

Journey verification requires all of the following:

  1. Every required Step maps to at least one Acceptance Item.
  2. Every referenced required Acceptance Item is verified.
  3. Strong, fresh, applicable path evidence proves the declared Step order and connection.
  4. Path evidence proves the expected outcome, not merely that local components exist.
  5. Required failure or recovery paths are explicitly represented.
  6. No unresolved Journey or Journey Step gap remains.

All Acceptance Items being verified does not imply that a Journey is verified. Without adequate path evidence, keep the Journey implemented, record an evidence gap, and reject delivery completion.

Evidence Quality

Evidence is strong only when it proves its declared target, covers named edge cases, is fresh or still applicable, and is part of the normal verification gate or has an explicit manual record. Weak evidence cannot support verified.

  • Item evidence proves one Acceptance Item criterion.
  • Path evidence proves Journey Step order, connection, and the expected outcome.

The same artifact may support both targets only when each target and proves claim is recorded separately. A local assertion can be strong Item evidence yet weak Journey evidence. A successful walkthrough cannot substitute implicitly for weak or missing Item evidence.

Gap Ledger

Every gap needs:

  • affected Requirement ID or capability, plus Acceptance Item, Journey, and Journey Step IDs when applicable
  • observed gap
  • impact
  • decision: fix now, defer, block, reject, or split
  • owner or next responsible workflow
  • verification needed to close it

Do not hide gaps in prose summaries. If it matters, put it in the ledger.

Propagate gaps only to affected trace objects:

Item evidence gap
  -> Acceptance Item cannot be verified
    -> parent Requirement cannot be verified
      -> dependent Journeys cannot be verified
Journey-only path gap
  -> Journey cannot be verified
    -> delivery cannot be complete

A Journey-only path gap does not downgrade otherwise valid Requirement or Item evidence. If missing path evidence is first discovered after review freeze, fail the Completion Gate but do not automatically reopen the closed review. Reopen through the existing evidence_invalidated basis only when previously accepted evidence is later invalidated and trace impact warrants a controlled reopen.

Scope Amendment

Use a scope amendment when review or implementation discovers necessary work not present in the original requirements. Record source, rationale, impacted requirements, owner decision, expected verification, and whether it blocks completion. Unapproved amendments are not implementation tasks.

Completion Gate

Before claiming a phase, feature, plan, or task is complete:

  1. Re-read the latest requirements and plan.
  2. Check the authoritative required-child inventory revision, child scope refs, required_for_parent, and dispositions. Reject group completion, host_status, blocked/incomplete children, or silent deferred/residual aggregation as parent closure.
  3. Check every Requirement and canonical Acceptance Item ID line by line.
  4. Enforce Item-to-Requirement aggregation constraints; do not auto-promote a parent from partial child evidence.
  5. Confirm every verified target has target-specific proof. For registry evidence, resolve its Evidence Claim and check the artifact and evidence_claims[].validity.status; apply the same semantics to supported legacy inline evidence.
  6. Check the recorded Journey applicability decision and rationale.
  7. For every applicable Journey, check Step-to-Item mappings, referenced Item status, independent path claims, expected outcome, and Journey/Step gaps.
  8. Check review findings and scope amendments are classified.
  9. If bounded review governance applies, audit the contract's cadence, child_scope_policy, covered_child_scope_refs, batch_combination_policy, and host_native_required_batches against actual required batch coverage, valid parent coverage or cross-revision carry-forward, and review closure or a controlled reopen, deferral, block, or residual-risk decision. Review closure remains a sub-gate.
  10. Compute effective gates, confirm required host_gate_status, and keep any current_test_status_claim within the host freshness contract.
  11. For every new Operational Economy non-Goal closure packet declaring schema_version: "0.4.0", validate continuation: the true known parent disposition, or continuation_mode: advisory with parent_disposition: unknown for detached/lite unknown-parent work; mode-appropriate authority and locator, including resolvability for durable_host; remaining_scope_refs and next_entry_conditions; the actual execution_action; and stop_basis presence only for an actual stop or ending host_boundary, with absence otherwise. Preserve legacy schema_version: "0.3.0" closure packets without continuation and never infer scheduling authority.
  12. State the actual closure status: complete, complete_with_deferred_gaps, complete_with_residual_risk, incomplete, blocked, or invalid_requirements.
  13. Call delivery complete only when every required Requirement and every applicable Journey is verified; if required gaps remain, reject complete.

Common Failures

Failure Correction
Plan has tasks but no requirement IDs Add IDs before implementation starts.
Tests pass but requirements are unchecked Build the trace matrix and inspect each row.
Review only checks code quality Run a requirement coverage review first.
Review finding turns into work automatically Classify it and link it to an existing requirement, accepted amendment, or constraint first.
Reviewer reports one blocker and omits other dimensions Accept the finding, mark the batch incomplete, and do not freeze.
Re-review restarts open-ended review after every fix Bound it to frozen findings, changed evidence, and direct remediation risk.
Freeze treated as completion Close review if valid, then still run the full Completion Gate.
Foundation or component gate treated as Journey completion Require target-specific path evidence for the ordered Steps and expected outcome.
Acceptance Item copied into each Journey Keep one canonical nested Item and reference its stable ID.
All Acceptance Items verified, so Journey auto-verifies Keep Journey implemented until strong path and outcome evidence passes its own gate.
Technical domain label decides Journey applicability Apply actor-goal-path triggers regardless of UI, API, migration, infrastructure, or actor type.
Isolated change gets a synthetic Journey Record a justified not_required decision when item evidence fully proves the result and no path exists.
Missing path evidence after review freeze automatically reopens review Fail delivery closure; reopen only when accepted evidence is invalidated under controlled-reopen rules.
Late optional finding blocks closure Defer/reject unless an owner accepts an amendment.
Weak evidence marked verified Keep the row implemented and record evidence gaps.
Owner or verifier counts presented as completion evidence Use target-specific evidence and object dispositions; counts are diagnostic only.
Deferred work is mentioned informally Move it into the gap ledger with owner and close condition.
Next phase starts with hidden leftovers Convert leftovers into next-phase entry criteria or explicit exclusions.
Execution, verification, or review group completion closes a parent Aggregate only through the versioned required-child scope inventory.
Host done, archived, shipped, or override becomes RVTF complete Keep host lifecycle in host_status; derive RVTF disposition from trace truth.
One passing artifact blanket-verifies many targets Create independent target-specific Evidence Claims with proves, coverage, and validity.
Opaque fingerprint proves cross-revision validity Record the auditable comparison basis, rationale, assessor, policy, and decision.
Old valid claim is reported as current tests passing Run the fresh effective host gate before making a current-test claim.
Completion Gate always runs the full suite Run the complete semantic audit plus only the suites required by effective gates at this boundary.
Review dimensions become reviewer or batch count Preserve normative coverage; let host, expertise, independence, and policy determine execution shape.
Future parent review is used as Unit evidence Record review_state: pending_at_parent; keep formally reviewed closure incomplete until the receipt exists.
Historical batch is rewritten onto a new revision Keep it immutable and use assessed carry-forward, a delta batch, or controlled reopen.
Recording an accepted review verdict recursively triggers another review Separate the reviewed material subject from receipt-only finalization; do not re-review a terminal update solely because it records the verdict.
A mixed material change declares itself receipt-only Reject the declaration, default ambiguity to material, and require host-aware impact assessment plus the applicable review path.
Unit closure becomes Goal completion Close only the Unit and aggregate the authoritative remaining child inventory.
Continuation record acts as a scheduler Record authority, locator, and actual action, then leave invocation to the user, orchestrator, or host.
No-progress iteration repeats automatically Warn, select new unblocked scope, justify evidence-producing repetition, or record a blocker.