SuperAPI AI Directory

YunxiaoPMapp

Office & productivity

View repository

Updated 10-15 10:43

About this skill

YunxiaoPMapp

Product department Yunxiao automation (officially named YunxiaoPMapp). This Skill is self-contained;prohibits fork / include / "alignment"yunxiao-requirement-lifecycle。

Product manager sessiondo notmount the old lifecycle Skill at the same time, to avoid creating duplicate tasks.

Plan mode gate (mandatory · for any Yunxiao write)

For any operation that will modify Yunxiao (creating tickets, changing status, creating/modifying tasks, tagging, uploading attachments, changing assignee, creating sprints, etc.), the Agent's first stepmust:

  1. SwitchMode → plan(Note: align parameters and the execution checklist first, then apply in one go after confirmation).
  2. The Plan must clearly state: target requirement/tasknumber, statuses to be changed, the numbering strategy for delivery·analysis·design to be created/reused, sprint version type (if applicable), §0.1① placeholder risk checkboxes (if applicable),things that will not be done(do not create 【开发】/【测试】, do not deduplicate by title).
  3. Before the user confirms / approves the Plan / says "execute": apply is prohibited.
  4. After confirmation, switch back to Agent,execute the checklist in one go within the same turn, then verify and report once at the end; only stop midway if parameters are missing.

Exceptions (may read without entering Plan): only checking status / why it did not transition / give me a plan.

Prohibited: skipping Plan on the grounds of "parameters are complete", "speed path", or "the user is very familiar"; if the checklist for "approve plan" has not ticked off the key parameters, it is still considered an incomplete gate.

Source-of-truth model

需求状态 = 阶段看板唯一真相
【交付】 = 每需求最多 1 条容器(ASSOCIATED→需求)
【分析】/【设计】 = TASK_SUB→交付(交付「子项」必可见;与 ASSOCIATED 同 create 互斥)
【开发】/【测试】 = 不进本 Skill
查重/复用唯一渠道 = 任务编号(ONEOS-xx);禁止按标题

Numbering authority: requirement description ## 工作项编号(系统)(see references/workitem-ids.md)。
Operation order: command-line explicit number > read that block > ASSOCIATED/SUB validation; if there is a conflict, stop.

External calls (embedding the other party's full text in this Skill is prohibited)

Timing Call
Ingest and clean chat/recordings into the repository $AutoRDO(independent Skill; path AutoRDO/SKILL.md; do not embed cleaning details)
Design complete PRD + object storage link + backfill 【交付】 $oneos-autoprd(AutoPRD); creating 【交付】 still remains a placeholder, and the MD is only populated when design is complete
Project ID / He Fei ID / field ID assets/runtime-ids.json
Phase calendar work hours references/work-hours.md + assets/cn-workday-calendar.json + scripts/workday_hours.py

Routing (read in full as needed)

Scenario Module
Delivery tree, association conventions, prohibited items references/model.md
Description two-paragraph · AutoRDO / placeholder / AutoPRD references/description-split.md
Steps 0–5 standard path references/stage-flow.md
No-ticket fast track to pending development references/fast-track.md
Direct number push handoff references/number-push.md
Handoff gate · minimal rollback set references/handoff-and-rollback.md
Planned start/completion · phase calendar work hours references/work-hours.md
Make exports ZIP + copy screenshots references/make-export-attach.md
Create sprint · Vmajor.minor.patch · dual-mount references/sprint.md
Command surface references/commands.md
Acceptance checklist · reporting template references/acceptance.md
Handoff contract (development Skill entry) references/handoff-contract.md
Verified live-write API · ultra-fast ticket creation references/live-api.md · scripts/live_create_fast.py
2026-07-23 Retrospective and Time-Spent Comparison references/live-perf-2026-07-23.md

Command Quick Reference

记录需求:…;推进至=暂不推进|已确认|分析中|设计中|设计完成|待开发|待开发(快轨)
受理确认:ONEOS-xx
开始分析:ONEOS-xx
开始设计:ONEOS-xx;交付任务=…;分析任务=…
设计完成:ONEOS-xx;设计任务=…;原型=…
交棒开发:ONEOS-xx;交付任务=…
快轨待开发:ONEOS-xx
编号直推:分析任务=ONEOS-b / 设计任务=ONEOS-c / 交付任务=ONEOS-a
创建迭代:版本类型=主|副|子;交付任务=ONEOS-a,ONEOS-b,…;名称前缀=…

Follow-up CommandsPrefer including a task ID; if absent, read the "Work Item ID (System)"; if still absent, ask;Do not fill in based on the title。

End Point of This Skill

End after the handoff is complete (requirement = To Be Developed; [Delivery] Owner = He Fei). You may say one sentence: "Please have the technical manager use the Development Skill."
Exception: after the handoff, "Create Iteration and Associate Delivery" still belongs to YunxiaoPMapp.

Explicitly out of scope: Create [Development]/[Testing], attach repositories, create branches, submit for testing, write test cases.

§0.1 Five Completions (Summary)

  1. Handoff Placeholder: When the delivery description is still 等待设计任务完成后自动填入 ,it is allowedto hand off, but the Plan must check the risk box, and the first line of the report must be marked in red; do not pretend the materials are complete.
  2. Estimated Work Hours = Phase Calendar Work Hours(working days × 8, not human resource input); this must be indicated in footnotes and reports.
  3. ID Source of TruthIn the requirement's "Work Item ID (System)"; immediately PATCH that block after creation.
  4. No-Ticket Fast Track[Design] mustbe closed out on the same day(planned completion = same day + work hours + completed status); do not automatically AutoPRD.
  5. Dual-Segment Descriptionmust not overwrite each other; iterationdual attachment of delivery + requirement; if rollback and redesign are needed, thenopen a new design ID, and the delivery plan start is not changed.

See the respective references for detailed rules.